Calendar:QA TODO: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 8: | Line 8: | ||
* Upgrade testing from 0.1 Lightning to 0.3 Lightning | * Upgrade testing from 0.1 Lightning to 0.3 Lightning | ||
* Upgrade testing (if possible) from 0.2 Sunbird to 0.3 Sunbird | * Upgrade testing (if possible) from 0.2 Sunbird to 0.3 Sunbird | ||
* Create upgrade calendar seeds from the ICS files chaecked in with the dataloss bugs TODO: Get dataloss bugs link here | |||
Revision as of 17:05, 7 September 2006
Valid from September 7 to September 14
This is the calendar QA To Do list. Please pick an item and give us a hand!
Thanks for the Help
- QA wanted bugs
- Upgrade testing from 0.3a2 and 0.3a1 Sunbird to 0.3 Sunbird
- Upgrade testing from 0.1 Lightning to 0.3 Lightning
- Upgrade testing (if possible) from 0.2 Sunbird to 0.3 Sunbird
- Create upgrade calendar seeds from the ICS files chaecked in with the dataloss bugs TODO: Get dataloss bugs link here