Status Report: Week ending March 7th, 2010

Issues

Issue Resolution
[ON TRACK] Car rear-ended ETA Friday March 5th
[CARRY OVER] Clonezilla broken due to network issue Marcia informs me that the cloning process I worked so hard to set up is bricked due to the lab being moved to the build network -- machines cannot access the server the images are stored bug 542856
Informed Tony so he could escalate the issue

Project Status

BFT Cleanup

Weekly Goal Work Completed
Vet Security Litmus results No results to vet
Vet Session Store Litmus results No results to vet
Vet Security Bug queries UNCONFIRMED: 0
VERIFY: 0
QAWANTED: 0
IN-LITMUS?: 0
Vet Session Store Bug queries UNCONFIRMED: 3

VERIFY: 8

QAWANTED: 0
IN-LITMUS?: 0

Community

Weekly Goal Work Completed
[CARRY OVER] Create initial draft of AMO/SUMO doc Met with stephen to design an outline of webtesting documentation. We decided that this project really needs a top-level general webtesting document before an AMO/SUMO specific document can be created.
Mozmill for Addons Testday Sent out week before reminder
Directed traffic, communications during testday
Results page set up

Firefox 3.next

Release/Update Testing

Weekly Goal Work Completed
Firefox 3.7a2 Ran Linux smoketests, found 1 bug

Doorhanger Notifications

Weekly Goal Work Completed
Project currently on hold

Tab Matches Awesomebar

Weekly Goal Work Completed
[CARRY OVER] Familiarize myself with feature and identify potential test cases bmcbride informed me that work is still pending SR from mconnor. I've asked bmcbride to provide me a tryserver build.
Received a try-server build from bmcbride
Wrote 25 draft test cases -- awaiting review from bmcbride

Prefs UI

Weekly Goal Work Completed
[AT RISK] Write a draft testplan Alex Faaborg informed me that the feature is no longer being actively designed/developed. It probably will not make it into the next major release.

Print Preview

Weekly Goal Work Completed
Write a draft testplan Spoke with rflint, project currently on hold

Mozmill

Weekly Goal Work Completed
Write 3 Download BFT scripts bug 550212 [DownloadsAPI] Add a method to do a complete cleanup of the download manager
bug 524859 Test script for Pause Active Download test case
bug 524860 Test script for Cancel Active Download test case
bug 524856 Test script for Retry Active Download test case
bug 536281 Test script for Resume Paused Download test case

Personal

Weekly Goal Work Completed
Revise Status Update Layout BFT cleanup layout revised based on feedback from Tony
Create invoice template for Matt Invoicing template created and emailed to Matt

Meetings

  • All-hands meeting
  • 1-on-1 with Tony
  • QA Work Week

Goals for Next Week

BFT Cleanup

  • Merge Smoketests
    • Popup blocked + Popup allowed
  • Vet BFT results
  • Vet Bugzilla queries

Community

  • Tab Matches Awesomebar Testday
    • Set up an event page (overwrite Litmus 2 testday)
    • Create blog post

Firefox 3.next

  • Tab Matches Awesombar
    • Get test cases into Litmus
    • Plan a testday for end Q1/early Q2 (see community section above)
  • Other features are inactive, pick a new feature area

Mozmill

  • Revise Mozmill script for popup blocked + popup allowed
  • Make revisions to in-review test scripts (5 total)
  • Make revisions to DownloadsAPI.cleanAll() patch
  • Create 3 new Downloading test scripts

Personal

Time Away

  • none