Platform/2010-11-09: Difference between revisions

Jump to navigation Jump to search
Line 53: Line 53:
** ~15 of 40 n900s imaged. Waiting for all to be in production before we can enable on tryserver
** ~15 of 40 n900s imaged. Waiting for all to be in production before we can enable on tryserver
* {{bug|559964}}: Schedule gcc 4.5 switchover
* {{bug|559964}}: Schedule gcc 4.5 switchover
* Rest of backordered shelves have arrived at our Santa Clara data center.  IT will be moving the rest of the test minis from Castro to Santa Clara this week (either piecemeal, or all at once during a downtime, TBD)


= Roundtable =
= Roundtable =
Confirmed users
2,456

edits

Navigation menu