Unified Telemetry/Status reports/October 7 2015: Difference between revisions
(→Outstanding requests not yet road mapped into a release: list current details) |
(→Exec Summary: changed date) |
||
| (One intermediate revision by one other user not shown) | |||
| Line 12: | Line 12: | ||
* Validation project becomes [https://wiki.mozilla.org/Unified_Telemetry/Data_Continuity Data Continuity project]; focus moves to building the executive dashboard from both sources of data (v2 and v4) | * Validation project becomes [https://wiki.mozilla.org/Unified_Telemetry/Data_Continuity Data Continuity project]; focus moves to building the executive dashboard from both sources of data (v2 and v4) | ||
* 5% release data from 42 is flowing and available for analysis in Spark. 5% release data not yet available in [https://bugzilla.mozilla.org/show_bug.cgi?id=1210873 telemetry dashboard] | * 5% release data from 42 is flowing and available for analysis in Spark. 5% release data not yet available in [https://bugzilla.mozilla.org/show_bug.cgi?id=1210873 telemetry dashboard] | ||
* Team works towards | * Team works towards a late october unified telemetry presentation to executive stakeholders | ||
* Building a roadmap and documenting the pipeline as a product (how other groups in Mozilla will engage with the pipeline) | * Building a roadmap and documenting the pipeline as a product (how other groups in Mozilla will engage with the pipeline) | ||
| Line 66: | Line 66: | ||
|- | |- | ||
| Fennec || done || done || || | | Fennec || done || done || || | ||
|- | |- | ||
|} | |} | ||
Latest revision as of 17:38, 8 October 2015
Unified Telemetry status report October 7, 2015
Overall Project Health
Last week: Yellow
This week: Green
Exec Summary
- Stakeholders have agreed to go 100% for both FHR V2 and Unified Telemetry in r42, then turn off FHR V2 in r43
- Validation project becomes Data Continuity project; focus moves to building the executive dashboard from both sources of data (v2 and v4)
- 5% release data from 42 is flowing and available for analysis in Spark. 5% release data not yet available in telemetry dashboard
- Team works towards a late october unified telemetry presentation to executive stakeholders
- Building a roadmap and documenting the pipeline as a product (how other groups in Mozilla will engage with the pipeline)
Risks/Issues
| Description of Risks/Issues | State | Owner | Plan to Resolve/Mitigation | Target Date |
|---|---|---|---|---|
| V4 data validation | Open | Sam | Waiting for more data; blocked on V2 outage. https://docs.google.com/document/d/1rvbCyVSzBsexer-0G7HdR_l1DczKAJdjzChxv0MjYco/ | 10/10 |
| Data continuity across V2/V4 | Open | Katie/Mark/Trink | Plan, Metabug | 11/2 |
| Legal review | Open | BDS/Legal | Meeting between groups | 10/10 |
| QA sign off (functional, load) | Done | Stuart | Telemetry/Testing | 8/24 |
| Operations - data retention requirements | Open | Travis/Katie | Eng team owes ops a doc defining ping types and data retention requirements | 10/10 |
| Remote about:healthreport content | In progress | Georg | Kicked off localization. | 11/2 |
| Budget, size of UT pings | In progress | Mark/BDS | Waiting for release data to spot any problems. https://metrics.services.mozilla.com/telemetry-budget-dashboard/ | 8/10 |
| Analysis difficulty | Open | Katie/tbd | Roadmap has several items related to this, need to consolidate as a project | 11/2 |
| Access to the 5% sample | Done | Sam/Roberto | Sam is using sample for Addons analysis | 8/10 |
Accomplished for Last Period
please see http://benjamin.smedbergs.us/weekly-updates.fcgi/project/firefox-measurement
Project Mgt
- completed sprint 1 for client and pipeline
Planned for Next Period
please see http://benjamin.smedbergs.us/weekly-updates.fcgi/project/firefox-measurement
- Continue work on validation doc (tentative date for presentation to executives is October 13)
- Meeting with Heather Crince on ramp up and legacy pipeline issues
- sprint 2 in progress
- Pipeline Sprint: http://mzl.la/1hybMyP
- Client sprint 2 - http://mzl.la/1NMqqjA
meetings with other teams
| Team | initial sit down (informal) | second meeting (formal) | PRD? | notes |
|---|---|---|---|---|
| iOS | done | TBD | Barb working on PRD | Dev track started |
| loop/hello | Done | TBD | unknown if required | Create UT data set |
| Fennec | done | done |
Requests from other teams
| Description | State | Owner | Notes | Target Date |
|---|---|---|---|---|
| FireFox OS | In process | Mark | App/FTU pings in pipeline; next step is to load redshift tables | Q4 |
| Hello | In process | Katie | Creating a derived stream: https://bugzilla.mozilla.org/show_bug.cgi?id=1181876 | Q4 |
| FxA Activity Event data for retention metrics | In process | whd | Initial data set made available, still need to automate: https://bugzilla.mozilla.org/show_bug.cgi?id=1207015 | Q4 |