Breakpad/Status Meetings/2011-Jan-19: Difference between revisions
< Breakpad | Status Meetings
Jump to navigation
Jump to search
| (3 intermediate revisions by 2 users not shown) | |||
| Line 11: | Line 11: | ||
= Migration = | = Migration = | ||
the [https://spreadsheets.google.com/ccc?key=0Aqs5R9yf9EA9dDF6aDUtQk5JNkVOSXhKdWJGV2hNX3c&hl=en&authkey=CIK165kE#gid=0 plan] and the [https://spreadsheets.google.com/ccc?key=tZnTSDt8h9cAZ9Cna6tgsGQ&hl=en#gid=0 checklist] | |||
* Smoke Test | * Smoke Test | ||
** Test plan [rhelmer] [https://wiki.mozilla.org/Socorro/Pre-PHX_Smoketest_Schedule schedule] | |||
** Can we now test with loaded HBase? | |||
** When to run component failure/failover tests? | |||
* HBase | * HBase | ||
** Daniel/X to update | |||
** [https://wiki.mozilla.org/Socorro:HBaseDataMigration Hbase specific steps] | |||
** Sync: exact plans please | |||
*** Are we doing another full sync before Sat? (Thursday night was orig plan) | |||
*** SJC ->SCL2??? | |||
* Postgres | * Postgres | ||
** Josh update | |||
* Network issues | |||
** What are we going with? What do we still need from netops? | |||
** How will we test this? | |||
* Rehearsal | |||
** Dress rehearsal for migration: 1pm PT Friday | |||
Latest revision as of 20:51, 19 January 2011
1.7.6
- canceled for SJC production
1.7.5.6
Introduced to resolve fallback trouble during HBase downtime
- bug 626328 - collectors can fail to send to disk
- lead to discovery of
- bug 626944 - hbaseResubmit cron missing on two collectors
- bug 627028 - IT set up missing cron on two collectors
- discussion of ramifications of introducing old crashes now
Migration
- Smoke Test
- Test plan [rhelmer] schedule
- Can we now test with loaded HBase?
- When to run component failure/failover tests?
- HBase
- Daniel/X to update
- Hbase specific steps
- Sync: exact plans please
- Are we doing another full sync before Sat? (Thursday night was orig plan)
- SJC ->SCL2???
- Postgres
- Josh update
- Network issues
- What are we going with? What do we still need from netops?
- How will we test this?
- Rehearsal
- Dress rehearsal for migration: 1pm PT Friday