QA/Fennec/Waverley/2011-02-08: Difference between revisions

From MozillaWiki
< QA‎ | Fennec‎ | Waverley
Jump to navigation Jump to search
 
(5 intermediate revisions by 2 users not shown)
Line 11: Line 11:
** Panorama ownership
** Panorama ownership
* Waverley (vlad, alex, george, andrei, teodosia)
* Waverley (vlad, alex, george, andrei, teodosia)
** Status:
** Worked on:
*** [https://wiki.mozilla.org/Releases/Firefox_4b11/Test_Plan:Smoketests Smoketests and BFTs for 4b11 RC across platforms]
*** [https://wiki.mozilla.org/Releases/Firefox_4b11/Test_Plan:Smoketests Smoketests and BFTs for 4b11 RC across platforms]
*** [https://wiki.mozilla.org/Releases/Firefox_4b11/Test_Plan:Feature_Area_Testing#Web_Console_.28vlad.29 Bug verifications and focus testing results]  
*** [https://wiki.mozilla.org/Releases/Firefox_4b11/Test_Plan:Feature_Area_Testing#Web_Console_.28vlad.29 Bug verifications and focus testing results]  
Line 21: Line 21:
<i> (eg. Status, top issues) </i>
<i> (eg. Status, top issues) </i>
* Mozilla (test lead)
* Mozilla (test lead)
* Waverley (tester)
** Feb 15th code freeze
** Builds expected on Feb 17
* Waverley (Ioana, Anna, Andreea)
** Weekly Status:
*** run BFTs, OS integration tests and daily smoke tests on all available devices (Samsung Galaxy S Captivated, HTC Desire, Motorola Droid 2 an d Nokia N900) and bug validation [https://wiki.mozilla.org/QA/Fennec/Waverley#Results daily results ]
*** finished the performance tests of 4.0b4; [https://wiki.mozilla.org/QA/Fennec/PerformanceBenchmark wiki page ] and [https://spreadsheets.google.com/ccc?key=0AocUyLHteCtSdDJrNkZFaE1kUktlUGItRktJXzB5ZVE&hl=en&authkey=CLz_9McK#gid=1 results]
 
== Round Table ==  
== Round Table ==  
<i> (eg. Other items to discuss) </i>
<i> (eg. Other items to discuss) </i>

Latest revision as of 16:05, 8 February 2011

Meeting Notes for 2011-02-08

Welcome

(eg. headcount, updates with staffing, vacation/away time)

Firefox Updates

(eg. Status, top issues)

Fennec Updates

(eg. Status, top issues)

  • Mozilla (test lead)
    • Feb 15th code freeze
    • Builds expected on Feb 17
  • Waverley (Ioana, Anna, Andreea)
    • Weekly Status:
      • run BFTs, OS integration tests and daily smoke tests on all available devices (Samsung Galaxy S Captivated, HTC Desire, Motorola Droid 2 an d Nokia N900) and bug validation daily results
      • finished the performance tests of 4.0b4; wiki page and results

Round Table

(eg. Other items to discuss)

Take Aways

(eg. Action items)