IT/Production Acceptance/all.html redesign: Difference between revisions

 
Line 9: Line 9:
* Outline the following:
* Outline the following:
** Overall goal of the project
** Overall goal of the project
***The overall goal of this project is to create a better all.html page. I define "better" as intuitive, easy to navigate, and with a clear Call to Action--also defined as imporved downloads.
***The overall goal of this project is to create a better all.html page. I define "better" as more intuitive, more easily navigable, and with a clear Call to Action--also defined as improved # of downloads.
***We will do this by building three versions of the page, as designed by TRO. We will test all three pages simultaneously, and the page that garners the most downloads during the testing period becomes permanent.   
***We will do this by building three versions of the page, as designed by TRO. We will test all three pages simultaneously, and the page that garners the most downloads during the testing period becomes permanent.   
** Any pre-requisites needed (technology, server capacity, staffing, monitoring, response time, etc)
** Any pre-requisites needed (technology, server capacity, staffing, monitoring, response time, etc)