L10n/HomePage/Status/2009-07-15: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
(Created page with '__NOTOC__ <small>« previous meeting | index | next week »</small> Meeting Det…')
 
No edit summary
Line 10: Line 10:


== Attendees ==
== Attendees ==
Axel, Wil
Axel, Wil, Gandalf


== Meeting Notes ==
== Meeting Notes ==


== Firefox ==
== Firefox ==
* Firefox 3.5.1 in build
** mk and sr, plus other fixes to locales.
** pt-BR repo is busted by hg update


== Web L10n ==
== Web L10n ==
 
* pascalc is afk


== Productization ==  
== Productization ==  
* pushed out to 3.5.2
* Currently targetting bn-BD, es-MX, or, tr for de-beta, details on [[L10n:Triage/Firefox 3.5.x]]
* Currently targetting bn-BD, es-MX, or, tr for de-beta, details on [[L10n:Triage/Firefox 3.5.x]]


== Tools ==
== Tools ==
 
* AMO pushing live tonight
* verbatim making progress, catching up to where it was
* signoff still going through iterations
* silme 0.7.1 late this week. Some patches by Adrian.
* contribute.mozilla.org work, merging with mozilla.org/contribute


== QA ==
== QA ==
 
* Clint looking at parsing errors? {{bug|504339}}
 


== Roundtable ==
== Roundtable ==
* All those milestones that we ship? Need to wrap down on what l10n expectations we have for each.

Revision as of 16:39, 15 July 2009

« previous meeting | index | next week »

Meeting Details

  • 9:00 AM Mountain View Time (UTC -7)
  • 650-903-0800 x92 Conf# 206 (US/INTL)
  • irc.mozilla.org #l10n-drivers for backchannel
  • (notetaker: Axel)

Attendees

Axel, Wil, Gandalf

Meeting Notes

Firefox

  • Firefox 3.5.1 in build
    • mk and sr, plus other fixes to locales.
    • pt-BR repo is busted by hg update

Web L10n

  • pascalc is afk

Productization

Tools

  • AMO pushing live tonight
  • verbatim making progress, catching up to where it was
  • signoff still going through iterations
  • silme 0.7.1 late this week. Some patches by Adrian.
  • contribute.mozilla.org work, merging with mozilla.org/contribute

QA

Roundtable

  • All those milestones that we ship? Need to wrap down on what l10n expectations we have for each.