Breakpad/Status Meetings/2011-Apr-27: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
 
(11 intermediate revisions by 4 users not shown)
Line 1: Line 1:
= Roundtable =
= Roundtable =
* bsavage
** Redesign of reports list page
** Minor UI tweaks for 1.7.8
* deinspanjer
* jabba
** Introducing Matt Pressman, new in-house DBA
* jberkus
* kairo
* lars
* laura
** 1.7.8 triage
** Landed 1.7.7 tweaks
* lonnen
** new dashboard page
** integrating user created reports
* mbrandt
* rhelmer
* ted
* Others?


= 1.7.8 =
== bsavage ==
* Quick triage [http://tinyurl.com/socorro-1-7-8 bugs]
* Redesign of reports list page
* Freeze May 12
* Minor UI tweaks for 1.7.8  
== deinspanjer ==
== jabba ==
* Introducing Matt Pressman, new in-house DBA
== jberkus ==
* knocking out 1.7.8 changes, goal of completion next Friday
== kairo ==
== lars ==
* refactoring nearly complete
** new config system in place
** new auto service discovery
*** in middleware
*** in collector
*** in other apps soon
* merge trunk into my branch in progress
* merge back into trunk will be distruptive
** need to meet with rhelmer about integration


= ElasticSearch =
== laura ==
* Any items?
* 1.7.8 triage
* Landed 1.7.7 tweaks
== lonnen ==
* new dashboard page
* integrating user created reports
== mbrandt ==
== rhelmer ==
* trunk/staging box up
* working on vagrant VM setup
== ted ==
== Others? ==


= Dev and staging sever updates =
= 1.7.8  =
* [jabba, rhelmer]


= Goals =
*Quick triage [http://tinyurl.com/socorro-1-7-8 1.7.8 bugs]
* Ended up with goals as follows:
*Freeze May 12
** Implement ElasticSearch indexing of processed crash reports
** Ship two end-user feature focused releases for Socorro (these will be 1.7.8 and 1.9)


= Other items =
= ElasticSearch  =
* Laura traveling tomorrow, PTO Friday
 
* Matt low availability May 10th - 13th
*Any items?
* need to determine requirements
** how to build it out? do we need new machines?
*** more memory is good
**** 24GB/memory, 1TB disk
*** how far back do we want to go (30-day window?)
**** probably 3 months, aphadke to determine requirements
 
= Dev and staging sever updates  =
 
*[jabba, rhelmer]
** standalone Hbase, LZO issues etc.
** starting from pristine DB versus importing
** pending DNS changes {{bug|652581}}, will be crash-stats-trunk.allizom.org
*extraction script for personal dev databases -- authorized?
 
= Goals  =
 
*Ended up with goals as follows:
**Implement ElasticSearch indexing of processed crash reports
**Ship two end-user feature focused releases for Socorro (these will be 1.7.8 and 1.9)
 
= Other items =
 
*Laura traveling tomorrow, PTO Friday  
*mbrandt low availability May 10th - 13th

Latest revision as of 18:40, 27 April 2011

Roundtable

bsavage

  • Redesign of reports list page
  • Minor UI tweaks for 1.7.8

deinspanjer

jabba

  • Introducing Matt Pressman, new in-house DBA

jberkus

  • knocking out 1.7.8 changes, goal of completion next Friday

kairo

lars

  • refactoring nearly complete
    • new config system in place
    • new auto service discovery
      • in middleware
      • in collector
      • in other apps soon
  • merge trunk into my branch in progress
  • merge back into trunk will be distruptive
    • need to meet with rhelmer about integration

laura

  • 1.7.8 triage
  • Landed 1.7.7 tweaks

lonnen

  • new dashboard page
  • integrating user created reports

mbrandt

rhelmer

  • trunk/staging box up
  • working on vagrant VM setup

ted

Others?

1.7.8

ElasticSearch

  • Any items?
  • need to determine requirements
    • how to build it out? do we need new machines?
      • more memory is good
        • 24GB/memory, 1TB disk
      • how far back do we want to go (30-day window?)
        • probably 3 months, aphadke to determine requirements

Dev and staging sever updates

  • [jabba, rhelmer]
    • standalone Hbase, LZO issues etc.
    • starting from pristine DB versus importing
    • pending DNS changes bug 652581, will be crash-stats-trunk.allizom.org
  • extraction script for personal dev databases -- authorized?

Goals

  • Ended up with goals as follows:
    • Implement ElasticSearch indexing of processed crash reports
    • Ship two end-user feature focused releases for Socorro (these will be 1.7.8 and 1.9)

Other items

  • Laura traveling tomorrow, PTO Friday
  • mbrandt low availability May 10th - 13th