Sumo/Desktop Release Checklist: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
(→‎Before the release: test beta and social)
Line 2: Line 2:


= Before the release =
= Before the release =
* 3 weeks before release, look at Erin Lancaster's Firefox cross-functional deck, the beta and release notes to determine list of features that are new and modified
* 3 weeks before release, look at Erin Lancaster's Firefox cross-functional deck, test the beta (we all should be testing the beta and nightly at all times right :-) !) and release notes to determine list of features that are new and modified
* 2 weeks before release finish English Language SUMO articles and set to ready for localization
* 2 weeks before release finish English Language SUMO articles and set to ready for localization
* 1 week before release prepare Social FAQ and canned responses and check that features haven't been removed or disabled. If so, update the English Language SUMO articles
* 1 week before release prepare Social FAQ and canned responses and check that features haven't been removed or disabled. If so, update the English Language SUMO articles

Revision as of 15:21, 26 July 2017

WORK IN PROGRESS - DRAFT DRAFT DRAFT!

Before the release

  • 3 weeks before release, look at Erin Lancaster's Firefox cross-functional deck, test the beta (we all should be testing the beta and nightly at all times right :-) !) and release notes to determine list of features that are new and modified
  • 2 weeks before release finish English Language SUMO articles and set to ready for localization
  • 1 week before release prepare Social FAQ and canned responses and check that features haven't been removed or disabled. If so, update the English Language SUMO articles
  • 1 week before release, prepare for SUMO day
  • 1 week before release, post thread about the release with new and modified SUMO articles to the SUMO contributor forum

After the release:

  • day of release and day after check SUMO forums for trending issues
  • the Monday after release check SUMO forums for trending issue
  • 1 week after release, run a SUMO day
  • 3 weeks after release prepare a SUMO support report