|
|
| Line 1: |
Line 1: |
| = Agenda = | | = Agenda = |
| == What went not so well? == | | == What went not so well? == |
| * Finding regression windows
| |
| ** Example - between beta 5 and the tip in Dec, a regression occurred that drastically diminished page load performance. Tracking down this change basically halted development.
| |
| * Supporting fast plugin drawing
| |
| ** The work to get flash drawing fast seemed rushed and last minute.
| |
| * Release Engineering lead times are very long
| |
| ** Example - nightly linux mobile builds took about a year (bug 469290), try server took about 6 months (bug 465039).
| |
|
| |
|
| == What went well? == | | == What went well? == |
| * Work on performance between pre-RC1 and Final went very well.
| |
| * Interactions between the front end team and the back end team worked very well.
| |
| * Asking for small mozconfig changes from releng happened the same day.
| |
|
| |
|
| == How will we change in the future? (themes for improvement) == | | == How will we change in the future? (themes for improvement) == |