Releases/Fennec1.0maemo/Post Mortem
< Releases
Jump to navigation
Jump to search
Agenda
What went not so well?
* Lack of communication between QA and other groups (aakash)
* Starting with Beta 4, release dates weren't clearly communicated
* bugs weren't filed, just talked about (john+)
* Not enough visibility into time remaining for bugs
* overworked?
* bugs weren't acted on when triaged (bugs only worked on when assigned)
* bugs ignored when they should be acknowledged
* no backup for stewart
* not enough test cases for every patch
* no more meta bugs (tracking)
* Not enough communication between release and other teams, particularly around timelines
* Finding regression windows- time at the end of the year was dedicated to finding a regression after it's happened
* need to find regressions quicker
* disk cache parameter got turned on and took forever to find
* automated perf testing
* hard to know where we are in solving regressions
* lots of last minute time working on flash, risk should not be pushed towards the end of a release
* lead times on release engineering are long, took one year to set up mobile linux builds, tri-server took 6 months
* hard to ship 1.0 releases because you're doing everything at the same time- everything is priority
* Launching multiple OS's at the same time sapped resources
* Delayed early on due to unstable platform and hardware availability
* N900's weren't easy to get until very late 2009/early 2010
* Need to figure out how to get hardware faster if we move towards bundling
* Spent too much time blocking ourselves on stuff
* Need to make decisions to cut features
* Need to be realistic regarding perf/launch features
* Lots of debate over choices which could be deferred and could be prioritized
* 1.0 was way too big
* Prioritized features + quality over time
* Scheduling between desktop + mobile for firefox and weave was tricky
* Pressure to make last minute design changes as we approach 1.0 release
* unit tests were ignored
* Not sure which devices to support (n810 vs n900)
* Firefox processes for mobile may not have been the best fit
* L10n communication was abrupt and cantankerous, crankiness--, should have worked more closely with team to solve problems
* Releng didn't have a good sense at 1.0 to understand expectations for launch (signing, crosschecking)
* "Ship when ready" is hard on non-engineering teams
* not enough warning on releases
* unclear to releng what was in each release
* more communication between mobile and platform teams
* tracemonkey drops would surprise mobile teams
* winmo was affected for 2 weeks as a result- need automation
* wrong people at thursday release meetings
* Bugs get forgotten, and people don't necessarily know the ramifications of their changes
* no automated testing, but anecdotal evidence wasn't taken seriously
* didn't do a good enough job listening to users and support forum, particularly early adopters
* good "getting started" documentation for n900 but not a lot of FAQ info (how to set default browser, manage plugins, etc)
* Standards around good add-ons for mobile were fluid and hard for developers to understand