Firefox OS/Teams/Comms

From MozillaWiki
Jump to: navigation, search

Comms team (Dialer, SMS, Contacts)

Team site

UX specs

Team members

  • PM
    • Wilfred Mathanaraj (UK)
    • Jorge Munuera (Madrid, SP) - jmunuer@tid.es
  • Eng Mgr:
    • David Scravaglieri (Paris, FR)
  • UX
    • Stephany Wilkes
    • Francis Djabri
    • Ayman Maat (Berlin, Germany) - aymanmaat@hotmail.com
    • Victoria Gerchinhoren (Barcelona, SP) - vpg@tid.es
  • EPM
    • Joe Cheng (Taipei)
    • Noemí Freire (Madrid, SP) - noef@tid.es
  • Devs:
    • Etienne (Paris, FR)
    • Julien (Paris, FR)
    • Anthony (Paris, FR)
    • Michal B (Paris, FR)
    • Fabien “kazé” Cazenave (Grenoble, FR)
    • Alexandre Lissy (Paris, FR)
    • Gabriele Svelto (Amsterdam, NL)
    • Steve Chung (Gaia, Taipei)
    • Rex Lee (Gaia, Taipei)
    • Gene Lian (RIL, Taipei)
    • Hsinyi Tsai (RIL, Taipei) - Telephony
    • Borja Salguero (Madrid, SP) - fbsc@tid.es
    • Fernando Campo (London, UK) - fernando.campo@o2.com
    • José Manuel Cantera (Valladolid, SP) - Eng Lead - jmcf@tid.es
    • Cristian Rodriguez (Valladolid, SP) . dedicated to Comms Apps track depending on Homescreen workload
    • Germán Toro del Valle (Barcelona, SP) - gtorodelvalle@gmail.com
    • Fernando Rodríguez Sela (Madrid, SP) - dedicated to Comms Apps track depending on STK needs - frsela@tid.es
    • Fernando Jiménez (Madrid, SP) - RIL (part of the RIL team, focused on Comms when needed) - ferjmoreno@gmail.com
    • José Antonio Olivera (Madrid, SP) - RIL (focused on Comms) - josea.olivera@gmail.com
    • Francisco Jordano (London, UK) - free agent - francisco.jordano@o2.com
  • QA:
    • Isabel Ríos (Madrid, SP) - isabelrios@aurigae.com
    • Rafael Márquez (Madrid, SP) - rafael.marquez@mtp.es
    • Al Tsai (TAIPEI)
    • Paul Yang (TAIPEI)
    • John Hammink (US)
    • Matt Brandt (US)

IRC channel

  • #fxos-comms

Mailing list

  • fxos-comms@mozilla.org

Vidyo room

  • VidyoRoom is "Joe Cheng"
  • Public link: http://goo.gl/z26FU
  • Equivalent dial-in bridge: +1 800 707 2533 (pin 369) Conf 99875# (toll free, Skype)

Meeting schedules

  • Standup Meetings
    • Every Monday / Wednesday / Friday: 5PM Taipei, 11AM Paris / Madrid, 10AM London
  • Backlog Grooming
    • Every Tuesday: 5PM Taipei, 11AM Paris / Madrid, 10AM London

Comms team work week

  • Date: Aug. 5, 2013 ~ Aug. 9, 2013
  • First meet up time: 09:30AM on Aug. 5, 2013.
  • Location: Mozilla Paris Office
  • Recommended Hotel: Holiday Inn - Paris Opera - Grands Blvds
    • 30-32 Boulevard Poissonnière Paris , 75009 France
  • Goals of the week
    • This is the first time that the whole team gets together face to face. Great time to build up greater team chemistry
    • PM
      • Functional team process introduction/discussion (especially poker planning and estimates)
      • Figure out better ways to manage Sprints. Pivitol Tracker? or Scrumbugs
    • Dev
      • Continue with Sprint 2 and work closely with Gaia devs/Gecko Devs/PM/UX/QA
    • UX
      • Continue with Sprint 2 and work closely with Gaia devs/Gecko Devs/PM/UX/QA
    • QA
      • Continue working on MozTrap for Sprint 2 items
      • Verify Sprint 1 completed features
      • Figure out how to track and assign ownership amongst Madrid/Taipei/US teams
      • Discuss creating unified communication mediums - bugzilla, scrumbu.gs, etc
      • Elevate needs list to project management
      • Discovery conversations with dev and pm team - what needs do they have?
      • Find low-overhead methods to communicate the level of done-ness for each phase of the sprint
        • important for both pm and comms qa team
        • Need to gather:
          • specs
          • builds where this code landed
          • UX wireframes
          • create test cases against home screen component
          • track all the related bugs
      • review Moztrap usage .. are there any points where the team needs training? feature requests?
  • Attendees:
    • Wilfred Mathanaraj (Product, London)
    • Joe Cheng (Eng. Program Manager, Taipei)
    • Steve Chung (Gaia, Taipei)
    • Rex Lee (Gaia, Taipei)
    • Gene Lian (RIL, Taipei)
    • Hsinyi Tsai (RIL, Taipei)
    • Al Tsai (QA, TAIPEI)
    • Paul Yang (QA, TAIPEI)
    • Borja Salguero (dev, SP)
    • Francisco Jordano (dev, London)
    • José Manuel Cantera (dev, SP)
    • Ayman Maat (ux, GE)
    • Francis Djabri (UX, SF)
    • Isabel Ríos (qa, SP)
    • Jorge Munuera (PM, SP)
    • Noemí Freire (epm, SP)
    • David Scravaglieri
    • Thomas Zimmermann
    • Gabriele Svelto
    • Julien Wajsberg
    • Etienne Segonzac
    • Anthony Ricaud
    • Alexandre Lissy
    • Michal Budzynski
    • Fabien Cazenave
    • Vivien Nicolas
    • John Hammink
    • Matt Brandt

Comms team plans

  • July 1~July 5
    • Sprint 1 - sprint planning
    • Bugs created (US/UX/Eng.)
    • UX/US continue to go deeper into Sprint 1 backlog items
    • Confirm work week
  • July 8~July 12 (Sprint 1)
    • Sprint 1 (1/3) for eng.
    • UX/US continue to go deeper into Sprint 2 backlog items
    • End of week summary
  • July 15~July 19 (Sprint 1)
    • Sprint 1 (2/3) for eng.
    • UX/US continue to go deeper into Sprint 2 backlog items
    • End of week summary
  • July 22~July 26 (Sprint 1)
    • Sprint 1 (3/3) for eng.
    • Sprint 1 retrospect
    • Sprint 1 demo
    • Sprint 2 - sprint planning
  • July 29~Aug 2 (Sprint 2)
    • Sprint 2 (1/3) for eng.
    • UX/US continue to go deeper into Sprint 3 backlog items
    • End of week summary
  • Aug 5~Aug 9 (Sprint 2)
    • Mini work week in Paris
    • Sprint 2 (2/3) for eng.
    • UX/US continue to go deeper into Sprint 3 backlog items
    • End of week summary
  • Aug 12~Aug 16 (Sprint 2)
    • Sprint 2 (3/3) for eng.
    • Sprint 2 retrospect
    • Sprint 2 demo
    • Sprint 3 - sprint planning
  • Aug 19~Aug 23 (Sprint 3)
    • Sprint 3 (1/3) for eng.
    • UX/US continue to go deeper into future backlog items
    • End of week summary
  • Aug 26~Aug 30 (Sprint 3)
    • Sprint 3 (2/3) for eng.
    • UX/US continue to go deeper into future backlog items
    • End of week summary
  • Sept 2~Sept 6 (Sprint 3)
    • Sprint 3 (3/3) for eng.
    • Sprint 3 retrospect
    • Sprint 3 demo
    • UX/US continue to go deeper into future backlog items
  • Sept 9~Sept 13 (bug fixing before FC)
    • Oslo work week - Fix all blockers
  • Sept 15 - FC for v1.2
    • \ o /