Contribute/Webdev/Group 01 28 13: Difference between revisions

no edit summary
No edit summary
 
(2 intermediate revisions by one other user not shown)
Line 1: Line 1:
[[Category:Webdev/Meetings]]
[[Category: Meeting Notes]]
[[Category:Contribute]]
=Meeting Details=
=Meeting Details=


Line 15: Line 18:
*** Luke and Brian Brennan to connect re: technical integration
*** Luke and Brian Brennan to connect re: technical integration
**** Pulling data out of [https://etherpad.mozilla.org/webdev-github-repositories selected Github repositories]
**** Pulling data out of [https://etherpad.mozilla.org/webdev-github-repositories selected Github repositories]
*** [https://bugzilla.mozilla.org/show_bug.cgi?id=823278 Open design challenge] -- templatized design challenge
*** Design
**** John has committed to have designs ready for March 1 -- needs deliverable information (file type, size, etc.) and can we reuse Github icons?
**** [https://blog.mozilla.org/creative/2013/01/23/community-design-mozilla-contributor-badges/ Open design process announced last week]
**** Les' badge generator tool could be useful for that -- http://static.lmorchard.com/art-maker/demo.html
**** Designs to be posted on [https://www.flickr.com/photos/tags/webdevbadges/ flickr with the webdevbadges tag]
**** Do we want to do more promotion?
*** February 7 brown bag at Grow Mozilla discussion
*** February 7 brown bag at Grow Mozilla discussion
*** March 1 launch for phase 1
*** March 1 launch for phase 1
Line 50: Line 54:


==Action Items==
==Action Items==
* Emily to set up follow-up meeting with John Slater to review badge submissions
* Luke and Ricky to work through issues getting data out of Github
* Group to talk through preparing for badge brown bag next Monday
* Emily and David to talk about how to roll out case study later in the quarter
Confirmed users
1,340

edits