Confirmed users
1,340
edits
No edit summary |
|||
| (2 intermediate revisions by one other user not shown) | |||
| Line 1: | Line 1: | ||
[[Category:Webdev/Meetings]] | |||
[[Category: Meeting Notes]] | |||
[[Category:Contribute]] | |||
=Meeting Details= | =Meeting Details= | ||
| Line 15: | Line 18: | ||
*** Luke and Brian Brennan to connect re: technical integration | *** Luke and Brian Brennan to connect re: technical integration | ||
**** Pulling data out of [https://etherpad.mozilla.org/webdev-github-repositories selected Github repositories] | **** Pulling data out of [https://etherpad.mozilla.org/webdev-github-repositories selected Github repositories] | ||
*** [https:// | *** Design | ||
**** | **** [https://blog.mozilla.org/creative/2013/01/23/community-design-mozilla-contributor-badges/ Open design process announced last week] | ||
**** Designs to be posted on [https://www.flickr.com/photos/tags/webdevbadges/ flickr with the webdevbadges tag] | |||
**** Do we want to do more promotion? | |||
*** February 7 brown bag at Grow Mozilla discussion | *** February 7 brown bag at Grow Mozilla discussion | ||
*** March 1 launch for phase 1 | *** March 1 launch for phase 1 | ||
| Line 50: | Line 54: | ||
==Action Items== | ==Action Items== | ||
* Emily to set up follow-up meeting with John Slater to review badge submissions | |||
* Luke and Ricky to work through issues getting data out of Github | |||
* Group to talk through preparing for badge brown bag next Monday | |||
* Emily and David to talk about how to roll out case study later in the quarter | |||