===Average timeline for testing one locale===
===Average timeline for Localization cycle in FxOS ===
Localization work has been estimated to last approx. 4 weeks, and should be (mostly) finished by the time we reach the "Soft l10n complete" date, that has previously been determined with Release Management. Once soft l10n complete date is reached, then QA starts intensive l10n testing.
The entire localization cycle has been estimated to last approximately 8 weeks starting at String Freeze date. String Freeze is when no more features are landing, and no patches with string modification land (ie no more adding, modifying, taking out strings in patches). Thus, String freeze usually corresponds to Feature Complete (FC), the later being determined by Release Management. String Freeze should always appear clearly in all release schedules. Historically, Release Managers always announce it as fully part of the schedule and make regular reminders to make sure everyone remembers and respects this.
This intensive testing lasts 2 weeks. This period is then followed by 4 weeks of fixing and verifying bugs. We then reach the period known as String Freeze.
 
 
Translating work for most teams starts at string freeze, and localizers have then 2 weeks to catch up with their work before QA starts. 2 weeks after string freeze, QA starts doing Localization Runs on all available languages.
 


;Typical calendar within FirefoxOS schedule:
;Typical calendar within FirefoxOS schedule:
* Feature complete corresponds to our "soft string freeze": most strings have landed, even though we know some more will come. Localization starts
* '''Feature landing''' corresponds to our "'''soft string freeze'''": 80% strings have landed, even though we know some more will come. Developers  and Release Managers must use the "late-l10n" keyword in Bugzilla if a patch with any kind of string modification is trying to land (ie an addition, an update or a deletion of a string). The late-l10n keyword should be used from this point onwards in the release. Release Management typically starts at this point being more aggressive towards if a feature/patch with a string change should land or not at this point in the cycle
* 4 weeks later is our "Soft l10n complete" and when the l10n Testing starts. This is the date that we announce to localizers that they should have finished doing their chunk of l10n. They take around 4 weeks to do this work, so we have to be able to tell them when the soft l10n freeze is in advance.
* '''Feature complete''' is our "'''string freeze'''" date: no more strings land or change at that point in the cycle. It is ultimately up to release management if a patch is critical enough that it justifies breaking string freeze and thus can land. It is good to consult with l10n team about this, but we are not the ones who will decide in the end. Continue use of "late-l10n" keyword in this phase
* Then there is 4 weeks of fixing/verifying bugs
* 2 weeks after string freeze: l10n Testing by QA starts. This is the date that we announce to localizers that they should have finished doing their chunk of l10n.
* there are 4 weeks between Soft l10n complete and hard string freeze
Then follows a cycle during which:
* 2 weeks: QA performs Localization Runs on all languages
* 2 weeks: localizers/devs fix bugs
* 2 weeks: QA/localizers verify that all issues are fixed
 


;Concerning l10n testing for ONE locale, and assuming there are at least eight full-time testers on a locale, we have identified
;Concerning l10n testing for ONE locale, and assuming there are at least eight full-time testers on a locale, we have identified
*3 days of smoke testing, bug filing, etc
*3 days for one full localization run on one locale, bug filing, etc (full time)
*4 weeks of fixing bugs and verifying them. This is approx. 2 weeks of devs/localizers going into their bugs to fix them, and approx. 2 weeks of us verifying them (full time).
 


;Average number of bugs that turn up with this kind of testing:  
;Average number of bugs that turn up with this kind of testing:  
Line 175: Line 182:
** 1st half: April 14 - April 18
** 1st half: April 14 - April 18
** 2nd half: May 12-16
** 2nd half: May 12-16
* v2.0 Localization Run schedule
See [https://www.google.com/calendar/embed?src=ust6tonpqd5fla4okglk2fbfuo%40group.calendar.google.com&ctz=America/New_York| Testing Calendar]


===Scaling Locale Testing===
===Scaling Locale Testing===
Confirmed users
1,043

edits