| Line 54: | Line 54: | ||
** Risk: blocked by Pin the Web, pin site card needs to be reworked for the control panel | ** Risk: blocked by Pin the Web, pin site card needs to be reworked for the control panel | ||
** Wait for Wilfred to decide if we can ship it (ai: Candice to check with Wilfred by the end of this week) | ** Wait for Wilfred to decide if we can ship it (ai: Candice to check with Wilfred by the end of this week) | ||
* Replaceable Homescreen: Teri | * Replaceable Homescreen: Teri | ||
| Line 119: | Line 113: | ||
Riding the train features: | Riding the train features: | ||
* RTL: William | * RTL: William | ||
** RTL UX spec timeline: v2.2 spec -> v2.0m spec -> v2.5 spec | ** RTL UX spec timeline: v2.2 spec -> v2.0m spec -> v2.5 spec | ||
| Line 307: | Line 296: | ||
* 2.5 feature list : couple of features will land in the last sprint? | * 2.5 feature list : couple of features will land in the last sprint? | ||
** keep reporting risks and test when things land; we're already at risk. | ** keep reporting risks and test when things land; we're already at risk. | ||
* [njpark] Updated Music test cases in moztrap (minor updates). Put tags on test cases that are automated in gaia-integration test, but those tests should still be run, since gaia-integration tests only run on B2G sim. The search and playlist feature should be complete by end of this week. | * [njpark] Updated Music test cases in moztrap (minor updates). Put tags on test cases that are automated in gaia-integration test, but those tests should still be run, since gaia-integration tests only run on B2G sim. The search and playlist feature should be complete by end of this week. | ||