Electrolysis/Meetings/2016-02-25: Difference between revisions

link to criteria
No edit summary
(link to criteria)
Line 53: Line 53:
== bsmedberg ==
== bsmedberg ==
* Regression in slow-script dialog count has been identified and cpeterson will arrange a meeting to determine next steps.
* Regression in slow-script dialog count has been identified and cpeterson will arrange a meeting to determine next steps.
* https://wiki.mozilla.org/Electrolysis/Release_Criteria


== RyanVM ==
== RyanVM ==
* Avi has been working to identify owners for the Talos test suites and their current status of e10s vs. non-e10s. Will be going through the results to work to identify owners of tests that need investigation.
* Avi has been working to identify owners for the Talos test suites and their current status of e10s vs. non-e10s. Will be going through the results to work to identify owners of tests that need investigation.
Confirmed users, Bureaucrats and Sysops emeriti
1,217

edits