1
edit
Mcbridematt (talk | contribs) |
Misterzilla (talk | contribs) |
||
| Line 5: | Line 5: | ||
If anyone wants to try, I would imagine SyncKolab would be a good start, as it seem to require anything outside the main TB distribution, except for the Calendar extension | If anyone wants to try, I would imagine SyncKolab would be a good start, as it seem to require anything outside the main TB distribution, except for the Calendar extension | ||
I am very motivated to form a working group to deal with these issues. If your interested to make the big move and start to do something than by all means lets make it happen. | |||
edit