canmove, Confirmed users, Bureaucrats and Sysops emeriti
2,798
edits
MarkFinkle (talk | contribs) (→Layers) |
|||
(8 intermediate revisions by 5 users not shown) | |||
Line 46: | Line 46: | ||
== Android == | == Android == | ||
* 19 blockers | |||
* multitouch zoom landed and is awesome | * multitouch zoom landed and is awesome | ||
* pause/resume regressed with e10s landings | * pause/resume regressed with e10s landings | ||
* protocol handlers still waiting for review | * protocol handlers still waiting for review | ||
* the latest version of the status bar notification patch, which includes all the comments, suggestions, and fixes, is ready for the last review | |||
== Electrolysis == | == Electrolysis == | ||
Line 70: | Line 72: | ||
== Layers == | == Layers == | ||
* Where are we with [[ | * Where are we with [[Mobile/Layers | Layers]] | ||
** Some code has landed | ** Some code has landed | ||
** Need panning & shadow trees working before we can switch Fennec to true <browser> | ** Need panning & shadow trees working before we can switch Fennec to true <browser> | ||
Line 91: | Line 93: | ||
=== Plugins === | === Plugins === | ||
* InstallTrigger patch has a few test failures on mozilla-central due to bug 565389, so waiting on that | |||
=== Performance === | === Performance === | ||
* Investigating a possible bug with nsRefreshDriver running at 50Hz when it shouldn't run at all (azakai) | |||
=== Networking === | === Networking === | ||
Line 109: | Line 115: | ||
** still not launching talos due to {{bug|575506}} -- anyone going to take this? | ** still not launching talos due to {{bug|575506}} -- anyone going to take this? | ||
* android, maemo5-gtk, maemo5-qt on try-as-branch (buildbot-0.8.0) | * android, maemo5-gtk, maemo5-qt on try-as-branch (buildbot-0.8.0) | ||
* browser-chrome is close | |||
== QA == | == QA == | ||
===Manual=== | ===Manual=== | ||
* bugs [http://bit.ly/bKpm6B filed] on the Fennec product over the past week | |||
* [https://wiki.mozilla.org/Firefox/Input/Releases/1.5 Input] will be mobile ready in the next 3-4 weeks | |||
* FORMFILL IS NOT OVER SIDEBARS. THANKS. | |||
* goals for upcoming week (in order of priorities): | |||
** Have Waverley start on nightly runs of trunk of n900s builds | |||
** Add assignments to the new features added | |||
** Start on adding testcases/testscripts to features landed (i.e. e10s and weave) | |||
===Automation=== | ===Automation=== |