Breakpad/Status Meetings/2014-12-17: Difference between revisions
< Breakpad | Status Meetings
(stub) |
m (→Travel, etc) |
||
| (9 intermediate revisions by 3 users not shown) | |||
| Line 20: | Line 20: | ||
=== AWS === | === AWS === | ||
* we are reading and writing in prod to/from s3. turning off hbase is blocked on moving correlations and module list. patch by end of the week? | |||
* hbase is being slowed down by our testing protocol. We feel confident turning that off now, though. | |||
=== DB === | === DB === | ||
* Just after 5 PM pacific we're failing over to new DB hardware | |||
=== ES === | === ES === | ||
=== Other === | === Other === | ||
* IT is imposing a change freeze from 23 through 28 December and 31 December through 2 January. | |||
== Project Updates == | == Project Updates == | ||
| Line 35: | Line 39: | ||
== other business == | == other business == | ||
* How we can help E10S (peterbe) | |||
** https://bugzilla.mozilla.org/show_bug.cgi?id=1110498 | |||
* Travis build times since using pip download cache (peterbe) | |||
** https://travis-ci.org/mozilla/airmozilla/builds | |||
** https://www.dropbox.com/s/n8wsgnf2yscndol/Screenshot%202014-12-17%2014.12.03.png?dl=0 | |||
== Travel, etc == | == Travel, etc == | ||
* Lonnen out Friday through End of Year | |||
* mbrandt PTO 12/20 | |||
== Links == | == Links == | ||
Latest revision as of 19:26, 17 December 2014
Meeting Info
Breakpad status meetings occur on Wed at 11:00am Pacific Time.
Conference numbers:
Vidyo: Stability 650-903-0800 x92 conf 98200# 800-707-2533 (pin 369) conf 98200#
IRC backchannel: #breakpad
Mountain View: Dancing Baby (3rd floor)
Operations Updates
AWS
- we are reading and writing in prod to/from s3. turning off hbase is blocked on moving correlations and module list. patch by end of the week?
- hbase is being slowed down by our testing protocol. We feel confident turning that off now, though.
DB
- Just after 5 PM pacific we're failing over to new DB hardware
ES
Other
- IT is imposing a change freeze from 23 through 28 December and 31 December through 2 January.
Project Updates
Socorro Bug Tracker
this week's bugs
PR Triage
other business
- How we can help E10S (peterbe)
- Travis build times since using pip download cache (peterbe)
Travel, etc
- Lonnen out Friday through End of Year
- mbrandt PTO 12/20