Performance Description: Difference between revisions
(template) |
Bobbychien (talk | contribs) (→MVP Scope: Update.) |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 83: | Line 83: | ||
=='''MVP Scope'''== | =='''MVP Scope'''== | ||
(please add correct bug tracking number) | (please add correct bug tracking number) | ||
<bugzilla> | <bugzilla> | ||
{ | { | ||
"blocks":" | "blocks": ["1133421", "987035"], | ||
"cf_feature_b2g":"2.6+", | "cf_feature_b2g":"2.6+", | ||
"status":["NEW","REOPENED","UNCONFIRMED","ASSIGNED","RESOLVED","VERIFIED","CLOSED"], | "status":["NEW","REOPENED","UNCONFIRMED","ASSIGNED","RESOLVED","VERIFIED","CLOSED"], | ||
| Line 157: | Line 155: | ||
|- | |- | ||
| EPM | | EPM | ||
| | | Bobby Chien | ||
| | | bchien | ||
|- | |- | ||
| EM | | EM | ||
| | | Kan-Ru Chen | ||
| | | kanru | ||
|- | |- | ||
| PM | | PM | ||
| | | Ravikumar Dandu | ||
| | | | ||
|- | |- | ||
| Line 173: | Line 171: | ||
|- | |- | ||
| UX | | UX | ||
| | | Tina Hsieh | ||
| | | | ||
|- | |- | ||
| QA | | QA | ||
| | | Mike Lien | ||
| | | | ||
|} | |} | ||
| Line 189: | Line 187: | ||
---- | ---- | ||
==UX Specs== | ==UX Specs== | ||
---- | ---- | ||
==Reference Links== | ==Reference Links== | ||
* [[Firefox OS/Performance Task Force|Performance Task Force]] | |||
* [[Firefox OS/Performance/Release Acceptance|Performance Release Acceptance]] | |||
* [[Firefox_OS/Performance/MTBF|MTBF]] | |||
* [[B2G/Power_Consumption|Power Consumption]] | |||
Latest revision as of 09:58, 11 November 2015

Program Description
Enter text here
Product Requirements:
Enter text here
User Stories and Acceptance Criteria
| Title | BUG ID | User story | Acceptance Criteria |
|---|---|---|---|
| Title Goes Here | Bug ID | User Story 1 | Acceptance Criteria 1 |
| Bug ID | User Story 2 | Acceptance Criteria 2 | |
| Help/Onboarding | Bug ID | User Story 3 | Acceptance Criteria 3 |
Program Status
| Milestone | Date | Status |
|---|---|---|
| Milestone 1 | ON TARGET | |
| Milestone 2 | CHALLENGED | |
| Milestone 3 | AT RISK |
Status Key
| Color | Status | Key |
|---|---|---|
| On Target | The project or deliverable is expected to meet its due date. | |
| Challenged | The project or deliverable is facing an issue that might cause it to miss its due date, but a “get well” plan has been developed to get it back on track. | |
| At Risk or Late | The project or deliverable is blocked or facing an issue that might cause it to miss its due date, and there’s no “get well” plan to get it back on track, or it is already late. | |
| Done | The project or deliverable has been completed. | |
| On Hold | The project or deliverable has been placed on hold. |
Program Timeline
MVP Scope
(please add correct bug tracking number)
| ID | Summary | Status | Target milestone | Resolution | Assigned to | Depends on | Blocks | Whiteboard | Feature b2g |
|---|---|---|---|---|---|---|---|---|---|
| 1223713 | [MTBF] Test Flame with 24 hours and 100 hours configuration | RESOLVED | --- | FIXED | Shako Ho | 987035 | 2.6+ | ||
| 1223715 | [MTBF] Test Aries with 24 hours and 100 hours configuration | RESOLVED | 2.6 S4 - 1/1 | FIXED | Shako Ho | 987035 | 2.6+ | ||
| 1224472 | [Meta] Raptor Activation on Treeherder | RESOLVED | --- | WONTFIX | 1230457 | 1133421 | 2.6+ |
3 Total; 0 Open (0%); 3 Resolved (100%); 0 Verified (0%);
Dependency Tracking
Detailed Program Plan
| Action Item | Engineering Owner | QA Owner | UX Owner | Bugzilla ID | Planned Done | Actual Done |
|---|---|---|---|---|---|---|
Program Stakeholders
| Role | Name | IRC |
|---|---|---|
| EPM | Bobby Chien | bchien |
| EM | Kan-Ru Chen | kanru |
| PM | Ravikumar Dandu | |
| TL | ||
| UX | Tina Hsieh | |
| QA | Mike Lien |
- EPM = Engineering Program Manager
- EM = Engineering Manager
- PM = Product Manager
- TL = Tech Lead
- UX = User Experience
- QA = Quality Assurance