  Story: Split panels in separate documents
We're estimating the stories in the priotization order defined previously.
    Estimate: [julien 5][oleg 10][steve 10]
 
  Story: Which questions do we need to answer ? (are there others)
=== Story: Split panels in separate documents ===
    Estimate: [julien 1][oleg 1][steve 1]
Estimate: [julien 5][oleg 10][steve 10]
  Story: Branching
 
    Estimate: [steve 1][julien 3][oleg 1]
=== Story: Which questions do we need to answer ? (are there others) ===
    (Julien: I think we need also to define how we merge between master and the branch)
Estimate: [julien 1][oleg 1][steve 1]
  Story: Review existing JS files to determine if they are frontend/backend. If some should belong to both, they need to be split
 
    Estimate: [julien 2][oleg 2][steve 2]
=== Story: Branching ===
  Story: Use the Bridge
Estimate: [steve 1][julien 3][oleg 1]
    Estimate: [julien 3][oleg 3][steve 5]
:(Julien: I think we need also to define how we merge between master and the branch)
  Story: Review UX flows with the Content Wrapper + Service Worker mechanism / Define the Data Flows
 
    Estimate: [julien 5][oleg 4][steve 3]
=== Story: Review existing JS files to determine if they are frontend/backend. If some should belong to both, they need to be split ===
  Story: IndexedDB in Gaia
Estimate: [julien 2][oleg 2][steve 2]
    Estimate: [julien 10][oleg 8][steve 15]
 
    (Oleg: really have no idea, how much is done, and how much is still needed)
=== Story: Use the Bridge ===
    (Julien: take as granted that not much has been done :) )
Estimate: [julien 3][oleg 3][steve 5]
  Story: Find out how Navigation steps work
 
    Estimate: [julien 3][oleg 2][steve 3]
=== Story: Review UX flows with the Content Wrapper + Service Worker mechanism / Define the Data Flows ===
  Story: Proxy mozAPI / Define which ones we use and we need in Worker
Estimate: [julien 5][oleg 4][steve 3]
    Estimate: [oleg 5][steve 5]
 
  Story: Reporting errors using notifications
=== Story: IndexedDB in Gaia ===
    Estimate: [oleg 2][steve 2]
Estimate: [julien 10][oleg 8][steve 15]
  Story: What views will be beneficial to store in render cache? (and how difficult is this?)
 
    Estimate:
:(Oleg: really have no idea, how much is done, and how much is still needed)
(Julien: I think we exceeded 30 so we can stop estimating; we now have an idea of what we can do in 6 weeks)
:(Julien: take as granted that not much has been done :) )
(I'll send this to our owners, maybe they'll want some features before some of the other things... we'll see)
 
(second note: given we started things below, maybe we can also at least finish the WIP patches we have.. ? today ? :p)
=== Story: Find out how Navigation steps work ===
(Oleg: I think we should finish what we've already started if it's not very time consuming, at least I started not very difficult things)
Estimate: [julien 3][oleg 2][steve 3]
(Julien: yeah I agree; I'll include some of the things in the planning, we can review tomorrow anyway -- if not finished today :) )
 
  Story: Refactoring Recipients
=== Story: Proxy mozAPI / Define which ones we use and we need in Worker ===
    Estimate:  
Estimate: [oleg 5][steve 5]
  Story: Lazy Loading heavy threads
 
    Estimate:  
=== Story: Reporting errors using notifications ===
  Story: What do we want to measure ?
Estimate: [oleg 2][steve 2]
    Estimate:  
 
  Story: Group MMS (note: some people are asking me about this these days)
=== Story: What views will be beneficial to store in render cache? (and how difficult is this?) ===
    Estimate:  
 
  Story: Separate repository
Estimate:
    Estimate:
 
:(Julien: I think we exceeded 30 so we can stop estimating; we now have an idea of what we can do in 6 weeks)
:(I'll send this to our owners, maybe they'll want some features before some of the other things... we'll see)
:(second note: given we started things below, maybe we can also at least finish the WIP patches we have.. ? today ? :p)
:(Oleg: I think we should finish what we've already started if it's not very time consuming, at least I started not very difficult things)
:(Julien: yeah I agree; I'll include some of the things in the planning, we can review tomorrow anyway -- if not finished today :) )
 
=== Story: Refactoring Recipients ===
Estimate:  
 
=== Story: Lazy Loading heavy threads ===
Estimate:  
 
=== Story: What do we want to measure ? ===
Estimate:  
 
=== Story: Group MMS (note: some people are asking me about this these days) ===
Estimate:  
 
=== Story: Separate repository ===
Estimate: