Mobile/Testing/09 04 13

< Mobile‎ | Testing
Revision as of 15:25, 4 September 2013 by Dminor (talk | contribs) (→‎A Team)

Previous Action Items

Status reports

Dev team

Rel Eng

IT

  • We've received delivery of all chassis in support of X86 and IT has handed them over to RelEng.
  • Started planning discussions for movement of infrastructure out of SCL1 and into SCL3. SCL1 lease is up on 7/31/2014.
  • Working with A-Team, RelEng and WPR to plan the Tegra move from MTV to the new Evelyn office.

A Team

  • tegra failure rate: [1.72%]
  • panda failure rate: [15.51%]
    • excluding retries: 1.70%
    • retries are much lower now (down from ~ 23% 3 weeks ago to ~ 14% now)
  • Mobile Bugs in Orange Factor Top 10
    • bug 807230 Intermittent DMError: Automation Error: Timeout in command {ls,ps,isdir,mkdr}

x86 automation

Autophone

Eideticker

Round Table

Action Items