Web Components Performance

Revision as of 18:53, 4 December 2015 by Oteo (talk | contribs) (Created page with "<div style="float: right; margin: 0px 0px 10px 25px;">link=</div> =='''Program Description'''== === Product Requirements:=== ===User Stories and Acc...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Fxossmall.png

Program Description

Product Requirements:

User Stories and Acceptance Criteria

Meta tracking the Web Component Performance effort Bug 1219559


Program Status

Milestone Date Status
Milestone 1 ON TARGET
Milestone 2 CHALLENGED
Milestone 3 AT RISK

Status Key

Color Status Key
On Target The project or deliverable is expected to meet its due date.
Challenged The project or deliverable is facing an issue that might cause it to miss its due date, but a “get well” plan has been developed to get it back on track.
At Risk or Late The project or deliverable is blocked or facing an issue that might cause it to miss its due date, and there’s no “get well” plan to get it back on track, or it is already late.
Done The project or deliverable has been completed.
On Hold The project or deliverable has been placed on hold.

Program Timeline

 


MVP Scope

Querying by 2.6+ features

(please add correct bug tracking number)

No results.

0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);



Dependency Tracking

 


Detailed Program Plan

Action Item Engineering Owner QA Owner UX Owner Bugzilla ID Planned Done Actual Done

Program Stakeholders

Role Name IRC
EPM Maria Oteo mariaoteo
EPM Bobby Chien bchien
EM Francisco Jordano francisco
PM Ravikumar Dandu
TL
ENG Etienne Segonzac
ENG Thinker Lee
ENG Greg Weng
ENG KanRu Chen
UX Tina Hsieh
UX Helen Huang
QA Isabel Rios isabel_rios
QA Mike Lien
  • EPM = Engineering Program Manager
  • EM = Engineering Manager
  • PM = Product Manager
  • TL = Tech Lead
  • UX = User Experience
  • QA = Quality Assurance

UX Specs


Reference Links