Breakpad/Status Meetings/2010-Jun-02
< Breakpad | Status Meetings
			1.7
- Staging / testing status?
- lars: NFS stuff?
 - QA asked to start testing stage
 
 - Likely release date: we've been asked to wait a week after 3.6.4, which is earliest Friday June 4 (chofmann, updates?), so looking at Thur 10 or Tue 15 at this stage.  (Other possibility if 3.6.4 is going to slip a lot is to ship this beforehand)
- Metrics will need to revisit our Q2 goals since it seems unlikely we'll be able to hit them with this release date.
 
 - Will be upgrading staging HBase cluster to a RC of HBase 0.20.5 so we can smoke test in preparation for upgrading Production as part of 1.7 push.
 - Will start running the production JSON fix M/R job this afternoon to validate initial results and to determine expected time to completion. Execution of the rest of the job should begin tomorrow morning.
 
1.8
- bugs
 - Some concern about shipping this in Q2, given the timeline for 1.7 and its dependency on 3.6.4. How does this affect the Metrics/IT goals?
 - bug 521351? (Is collector Apache config in svn anywhere?)
 
2.0 planning
- PRD draft almost complete
 - Next step: mocks from chowse
 
CrashKill
- Skiplist bugs for us, TB related
- bug 565412 desired actions not clear
 - bug 567012 comments?
 
 - Request filter by hangs/crashes/firefox only and filter by buildid (bug 540687, slated for 1.8) on topcrashers (chofmann)
 
Other issues
- ozten:
- 1 Selenium test, IT bug 569008 for creating an SVN repo for tests.
 - Currently testing ADU offset timing