Confirmed users
18
edits
Stujoetech (talk | contribs) No edit summary |
Stujoetech (talk | contribs) |
||
| Line 72: | Line 72: | ||
== Technical Outcomes == | == Technical Outcomes == | ||
By the end of the 12 weeks, we should have functional beta project that will have the basic features of a simple video editor including 2-track editing, transitions, timeline zooming, and more. Also, our web-based features such as multiple users, a chat window, and permissions should also be set up and functioning. | |||
Our account system should be running, first with Google Drive integration, then with our own servers. We should also begin the first phases of a public beta test. | |||
== Learning Outcomes == | == Learning Outcomes == | ||