Services/Meetings/2013-03-12
Jump to navigation
Jump to search
- Time: Tuesday at 9:15 AM PST / 12:15 PM EST / 5:15 PM UTC.
- Place: Mozilla HQ, 3-Zombocom (Vidyo room "Services")
- Phone (US/Intl): 650 903 0800 x92 Conf: 98616#
- Phone (Toronto): 416 848 3114 x92 Conf: 98616#
- Phone (US): 800 707 2533 (pin 369) Conf: 98616#
Ops
Hardware, Projects & Other
Engineering
Sagrada
Metrics (benbangert/rmiller/vng)
Heka
v0.1
- Heka 0.1 scheduled for production deploy behind sync today (https://bugzilla.mozilla.org/show_bug.cgi?id=844366).
- Debugging syslog / CEF / ArcSight message routing errors in marketplace's alt-dev environment.
v0.2
- Finishing up pipeline redesign, working locally under sustained load processing ~250K msgs/sec.
- Adding automated benchmarks to the Heka pipeline test suite.
- Successfully accepting statsd messages, routing through Heka, writing out to whisperDB time series file format, data verified as available via graphite-web UI and HTTP API.
- Lots of work refining documentation structure and generation.
SyncStorage/AITC (rfkelly)
Sync
Firefox Sync (gps)
Android Services (rnewman/nalexander/liuche)
SimplePush (jr)
- Looking into support issues for 14MM continuous connections.
EU team (alexis, hannosch, tarek)
- Further work on monolith, we collect almost all metrics on the zamboni to reach feature parity
- We got a zamboni branch to convert most graphs to get data from monolith
- Continuing work on packaging/prod setup
- Factored out ElasticSearch test harness (https://pyelastictest.readthedocs.org/en/latest/)
Other Project Updates
Campaign Manager/Product Announcements (jr)
QA
Client Testing and Sign-offs (tracy)
nothing client side to report.
Sync Server (jbonacci)
- Working with Dev and OPs on the following ticket:
- Bug 850057 - sync: server-storage stage deploy: server_storage -> 1.15-5, server_core -> 2.12-6
Persona/SignIn/BigTent (jrgm)
- Team is focused on the BigTent release.
- After that, we will be focused on the transition to AWS for QA/Dev/Stage/Prod environments
PiCL (jbonacci)
- Some preliminary research being done here.
- More focus after Services Work Week