Firefox3/Schedule: Difference between revisions
< Firefox3
		
		
		
		Jump to navigation
		Jump to search
		| Line 48: | Line 48: | ||
| ** API for extensibility | ** API for extensibility | ||
| ** Backup and restore | ** Backup and restore | ||
| * Identity framework (i.e. CardSpace support) | * Identity framework (i.e. CardSpace support) ? | ||
| * nsTextFrame migration to Thebes | * nsTextFrame migration to Thebes | ||
| * Growl Integration for OS X | * Growl Integration for OS X | ||
| * Cross Site XMLHttpRequest (Partial) | * Cross Site XMLHttpRequest (Partial) | ||
| * FUEL 0.2 | * FUEL 0.2 | ||
| * Offline Apps Support (partial) | |||
| |- valign="top" | |- valign="top" | ||
Revision as of 18:33, 9 May 2007
Please do not edit these pages without permission of the Gran Paradiso steering group. Your feedback and comments are welcomed on the discussion page.
Mozilla Developer's Calendar
The Mozilla Developer's Calendar holds the most up to date schedule for the development milestones and planned release dates of Mozilla products:
- subscribe to the ICS file (use Mozilla Sunbird, Apple iCal, or Google Calendar)
- add the calendar to your Google Calendar account.
- view the calendar as a webpage.
Gecko 1.9 / Firefox3 Milestone Schedule
This is draft milestone schedule for Gecko 1.9 and the Gran Paradiso release. We are currently in early-planning stages for Firefox 3, so these dates should not be considered fixed, but rather as a reflection of our current estimates. E.g. these are *draft* dates.
- Proposal for L10N cut-off dates
| Release | Date | Description | 
| Alpha 1 | December 2006 | Developer Preview ("Dogfood") Gran Paradiso alpha 1 release notes | 
| Alpha 2 | 8 Feb 2007 | Gecko 1.9a2 Release Notes, Gran Paradiso alpha 2 release notes | 
| Alpha 3 | 23 March 2007 | Gran Paradiso alpha 3 release notes | 
| Alpha 4 | 27 April 2007 | Gran Paradiso alpha 4 release notes | 
| Alpha 5 | 
 | 
 | 
| Alpha 6 | 
 | 
 
 | 
| Beta 1 | 
 | Feature Frozen, including UI.  All strings complete avail for l10n 
 | 
| Beta 2 | September 2007 | First l10n builds. All strings frozen | 
| Additional Betas and RCs based on need |