TestEngineering/UI/AMO/5.0.6 Test Plan: Difference between revisions
< TestEngineering | UI
Jump to navigation
Jump to search
No edit summary |
StuartPhilp (talk | contribs) m (StuartPhilp moved page TestEngineering/Web/AMO/5.0.6 Test Plan to TestEngineering/UI/AMO/5.0.6 Test Plan) |
||
| (3 intermediate revisions by 3 users not shown) | |||
| Line 1: | Line 1: | ||
'''AMO 5.0.6 test plan''' | '''AMO 5.0.6 test plan''' | ||
| Line 33: | Line 31: | ||
* Link validation | * Link validation | ||
* User interactions | * User interactions | ||
**Need to specify details here | |||
* JavaScript-disabled testing for: (1/4 day) | * JavaScript-disabled testing for: (1/4 day) | ||
**Front page | |||
**Browsing by category | |||
Other: | Other: | ||
| Line 52: | Line 50: | ||
Team needs to help cover: | Team needs to help cover: | ||
* Verifying copy is correct | |||
* Ensuring that final designs are correct | |||
Entry and Exit Criteria: | Entry and Exit Criteria: | ||
Latest revision as of 20:18, 26 August 2016
AMO 5.0.6 test plan
MOCK-UPS/Specs:
http://people.mozilla.com/~jscott/bandwagon/clearleft/v11/
STAGING SERVER: preview.addons.mozilla.org
Acceptance doc: ?
Planned Release date:
- Release is currently scheduled for June 2009
QA Resources:
- Stephen Donner (irc:stephend)
- Krupa Raj (irc:krupa)
QA Support Level:Level 1.
QA will cover:
- Detailed Browser Compatibility testing
- Doctype validation
- Basic Formatting and Appearance
- Link validation
- User interactions
- Need to specify details here
- JavaScript-disabled testing for: (1/4 day)
- Front page
- Browsing by category
Other:
- Accessibility testing-Marco?
- Localization testing-???[May have to involve the Localization community early on]
What is out of scope:
- Unit Testing
- Performance testing (Load, Volume, Stress)
- White Box testing
- Security testing
Team needs to help cover:
- Verifying copy is correct
- Ensuring that final designs are correct
Entry and Exit Criteria:
- Entry criteria:
- Mocks/Specs are made available to the QA team
- QA team has access to staging server
- 5.0.6 features are ready for testing
- Exit Criteria
- No crashing bugs.
- All features under the scope of this release are functional.
- All P0 and P1 bugs are either fixed or deferred.
- All P0/P1 fixes are verified by QA and marked as such in Bugzilla.
- QA has verified that the fixes have not caused major regression.
Test deliverables:
- Test Plan
- Bug reports
- Interim status updates
Assumptions and Risk Management:
- Assumptions:
- There is no schedule slippage from development.
- No feature creep.
- QA has the latest specs;QA is always informed of any changes to the project
- Risks and their management:
- Need to fill information here