Platform/Roadmap: Difference between revisions
< Platform
Jump to navigation
Jump to search
(e10s updates per last weeks status update meeting) |
(Sandboxing update) |
||
| Line 513: | Line 513: | ||
| style="vertical-align:top;" | | | style="vertical-align:top;" | | ||
* EME/CDM sandboxing for Windows 7+ | * EME/CDM sandboxing for Windows 7+ | ||
* e10s sandboxing for Windows | * e10s sandboxing for Windows (Low Integrity) | ||
* e10s sandboxing for OS X | * e10s sandboxing for Windows (Alternate Desktop) | ||
* e10s sandboxing for Linux | * e10s sandboxing for OS X (Minimal implementation) | ||
* e10s sandboxing for Linux (Minimal implementation) | |||
------ Items above planned to be done before or during Gecko 39 (Q1) ------ | ------ Items above planned to be done before or during Gecko 39 (Q1) ------ | ||
* EME/CDM sandboxing for Windows XP and Vista | * EME/CDM sandboxing for Windows XP and Vista | ||
| Line 521: | Line 522: | ||
* EME/CDM sandboxing for OS X | * EME/CDM sandboxing for OS X | ||
* EME/CDM sandboxing for Linux | * EME/CDM sandboxing for Linux | ||
* e10s sandboxing for Windows (Low Integrity) | |||
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ | ------ Items above planned to be done before or during Gecko 45 (End 2015) ------ | ||
* e10s sandboxing for Windows (Alternate Desktop) | |||
* e10s sandboxing for OS X (Minimal implementation) | |||
* e10s sandboxing for Linux (Minimal implementation) | |||
| style="vertical-align:top;" | | | style="vertical-align:top;" | | ||
* EME/CDM sandboxing for Windows 7+ | * EME/CDM sandboxing for Windows 7+ | ||
* e10s sandboxing for OS X | * e10s sandboxing for OS X | ||
* e10s sandboxing for Linux | * e10s sandboxing for Linux | ||
* e10s sandboxing for Windows | |||
------ Items above planned to be done before or during Gecko 39 (Q1) ------ | ------ Items above planned to be done before or during Gecko 39 (Q1) ------ | ||
* EME/CDM sandboxing for Windows XP and Vista | * EME/CDM sandboxing for Windows XP and Vista | ||
Revision as of 13:42, 15 July 2015
| Firefox Platform 2015 Roadmap | ||
| Owner: Martin Best | Updated: 2015-07-15 | |
| This roadmap outlines the current direction for Firefox Platform development through 2015. The following document is subject to change at anytime. It is also not a commitment to ship a features but rather an intent to implement and land them on by default in the nightly version of Firefox unless otherwise stated. | ||
Related Links:
Teams
Accessibility
| Current Plans | Previous Plans |
|---|---|
|
[everything below not finalized]
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
[everything below not finalized]
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
DOM
| Current Plans | Previous Plans |
|---|---|
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
e10s
| Current Plans | Previous Plans |
|---|---|
------ Items above planned to be done before or during Q1 ------
------ Items above planned to be done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Q1 ------ ------ Items above planned to be done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------ |
Graphics
| Current Plans | Previous Plans |
|---|---|
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
JavaScript
| Current Plans | Previous Plans |
|---|---|
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Layout
| Current Plans | Previous Plans |
|---|---|
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------
------ Items above planned to be done before end 2015 but may get reprioritized ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------
------ Items above planned to be done before end 2015 but may get reprioritized ------ |
Media
| Current Plans | Previous Plans |
|---|---|
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Mobile Platform
| Current Plans | Previous Plans |
|---|---|
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Networking
| Current Plans | Previous Plans |
|---|---|
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
PKI
| Current Plans | Previous Plans |
|---|---|
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------
|
|
Sandboxing
| Current Plans | Previous Plans |
|---|---|
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------
|
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Security
| Current Plans | Previous Plans |
|---|---|
------ Items above were done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
WebRTC / WebAudio
(All these features/fixes below are landing in Nightly during these quarters)
| Current Plans | Previous Plans |
|---|---|
------ Items were done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Web Compatibility
| Current Plans | Previous Plans |
|---|---|
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Initiatives
- 60fps
- Focused on producing a smooth, jank free experiences. 60fps goal is dependant on media type.
- BarrierSmash
- Ensure that accessibility features are working throughout our products.
- Candle
- Program targeted at reducing energy usage.
- CrashKill
- Improve the overall stability of Gecko and the project that rely on it.
- CritSmash
- Fix known critical security bugs.
- Electrolysis
- This is focused on providing multi-process browser (aka e10s).
- Offline
- Offline Support
- Presto
- Program targeted at improving overall load times and performance. This is resurrecting an older program that was discontinued.
- MemShrink
- Reduce memory usage (all products)
- Web Compatibility
- Improve the overall web compatibility of Gecko.
- Webify
- Reduce the webs dependence on plugins. This includes several content targeted initiatives such as the games program (Unity), Shumway (Flash), MSE/EME, WebRTC (Google Talk, Facebook Video)
- Games Program