Mobile/Projects/Kinderfox/Status/22-Jul-2015: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 23: | Line 23: | ||
== Exec Summary/Hot Topics == | == Exec Summary/Hot Topics == | ||
<!--Should explain WHY for the health/status reported above. Items covered here may be covered in more detail further down in the report. If senior management were to look at nothing but this section, they should be able to tell what is going on with the project.--> | <!--Should explain WHY for the health/status reported above. Items covered here may be covered in more detail further down in the report. If senior management were to look at nothing but this section, they should be able to tell what is going on with the project.--> | ||
* A fixed backlog has been created for the V1 release, and sizing estimates applied | * A fixed backlog has been created for the V1 release, and sizing estimates applied. | ||
* Approximately | * V1 scope has been defined to produce a minimum viable product. If any features are determined to not be possible for the 42 release, this means the V1 as a whole is not viable for 42. | ||
* Approximately 40% of the scoped work is assigned and in progress, while 57% is not yet started. | |||
== Risks & Issues == | == Risks & Issues == |
Revision as of 17:08, 24 July 2015
Status Report for Fennec - Kinderfox - for the period ending 24/07/2015
Overall Project Health
This Week | Last Week |
---|---|
N/A |
Exec Summary/Hot Topics
- A fixed backlog has been created for the V1 release, and sizing estimates applied.
- V1 scope has been defined to produce a minimum viable product. If any features are determined to not be possible for the 42 release, this means the V1 as a whole is not viable for 42.
- Approximately 40% of the scoped work is assigned and in progress, while 57% is not yet started.
Risks & Issues
Description of Risk/Issue | State | Owner | Plan to Resolve/Mitigation | Target Date |
---|---|---|---|---|
Lorem ipsum dolor sit amet consetetur sadipscing elitr sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat sed diam voluptua | Open | Joey | At vero eos et accusam et justo duo dolores et ea rebum Stet clita kasd gubergren no sea takimata sanctus est Lorem ipsum dolor sit amet | February 30th |
Accomplished for the Last Period
- Landed 1125316
- V1 Scope defined and backlog sizing completed
Planned for Last Period but Not Accomplished
Planned for the Upcoming Period
Status Details
Summary of Engineering Work
- Done - 3%
- In Review - 12%
- Assigned - 28%
- Available - 57%
- Example1.jpg
Example Chart 1 - Add Name Here
- Example2.jpg
Example Chart 2 - Add Name Here