Thunderbird:Participation:2011 Goals:General: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
No edit summary
Line 10: Line 10:
** (link to spreadsheet with Q1 area contrib goals goes here)
** (link to spreadsheet with Q1 area contrib goals goes here)
* overhaul [https://www.mozillamessaging.com/en-US/about/get-involved/ MoMo top-level funnel page]
* overhaul [https://www.mozillamessaging.com/en-US/about/get-involved/ MoMo top-level funnel page]
** January: prototype design & feedback/metrics loop
** February: prototype design & feedback/metrics loop
** February: deploy/iterate
** March: deploy/iterate
** March: iterate


== Q2 ==
== Q2 ==

Revision as of 20:13, 26 January 2011

Draft-template-image.png THIS PAGE IS A WORKING DRAFT Pencil-emoji U270F-gray.png
The page may be difficult to navigate, and some information on its subject might be incomplete and/or evolving rapidly.
If you have any questions or ideas, please add them as a new topic on the discussion page.

This is a straw man version. These goals are being driven by dmose, who is working with the area leads to ensure that the various area goals lead to and are compatible with these goals.

  • Attract X new contributors to the community
  • 4 iterations on Tb contribution funnels

Q1

  • Attract X/4 new contributors to the community
    • (link to spreadsheet with Q1 area contrib goals goes here)
  • overhaul MoMo top-level funnel page
    • February: prototype design & feedback/metrics loop
    • March: deploy/iterate

Q2

  • Attract X/4 new contributors to the community
    • (link to spreadsheet with Q2 area contrib goals goes here)
  • iterate on top-level funnel page

Q3

  • Attract X/4 new contributors to the community
    • (link to spreadsheet with Q3 area contrib goals goes here)
  • work with area FOO to create an area-specific funnel

Q4

  • Add X/4 contributors
    • (link to spreadsheet with Q4 area contrib goals goes here)
  • work with area FOO to iterate on funnel created last quarter