Gaia/New-Architecture-Program/Contacts/FxOS-S3(24 Jul): Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
Line 41: Line 41:
== Retrospective ==
== Retrospective ==
=== Actions taken from last sprint ===
=== Actions taken from last sprint ===
See [https://wiki.mozilla.org/Gaia/New-Architecture-Program/Contacts/FxOS-S2%2810_Jul%29#Actions_for_this_sprint_.28apart_of_the_Sprint_Objectives.29 this link]
See [https://wiki.mozilla.org/Gaia/New-Architecture-Program/Contacts/FxOS-S2%2810_Jul%29#Actions_for_this_sprint_.28apart_of_the_Sprint_Objectives.29 this link for more info]
*Raptor vs Marionette:
**AP1:Check Alberto repos to verify the performance measures extracted and printed using marionette. The idea is sharing it with Raptor team.
**AP2:Follow-up meeting with Eli to share with Raptor team, NGA Contacts's needs and also check the progress of bug [https://bugzilla.mozilla.org/show_bug.cgi?id=1169775 1169775]
*Development Synchronization is necessary: weekly meetings, or weekly mails so everybody is aware of the changes and progress in the NGA libraries.
**AP3:Vivien sent a complete update via dev-gaia list last 19th June but we need to ensure that this sync continues after Whistler ww.
*AP4:Create a demo branch where we can play/test the ongoing work (no for QA testing) that can help us to:
**We have agreed creating two repos:
***Production one: we will wait to create it when all the bugs pending to be landed in this sprint (FxOS-S1) are merged in master (specially the relative to open and new activities)
***Development one: it will be based on Whistler demo branch: https://github.com/borjasalguero/gaia/tree/demo


=== Things that went well ===
=== Things that went well ===
=== Things that went not that well ===
=== Things that went not that well ===
=== Actions for this sprint (apart of the Sprint Objectives) ===
=== Actions for this sprint (apart of the Sprint Objectives) ===

Revision as of 12:06, 13 July 2015

General info

  • Members
    • Borja Salguero (DEV)
    • Fernando Campo (DEV)
    • Jorge Prudencio (DEV)
    • Manuel Casas (DEV)
    • Alberto Villena (QA)
    • Maria Oteo (EPM)
  • Meetings:
    • Daily happening everyday in Mumble at 10:30 CEST
    • Sprint Planning, on Monday (every two weeks)
  • Links of interest:

Sprint objectives

Bugs for this sprint

No results.

0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);


Other bugs to pay attention

Daily meetings

Issues during the sprint

Demos

Retrospective

Actions taken from last sprint

See this link for more info

  • Raptor vs Marionette:
    • AP1:Check Alberto repos to verify the performance measures extracted and printed using marionette. The idea is sharing it with Raptor team.
    • AP2:Follow-up meeting with Eli to share with Raptor team, NGA Contacts's needs and also check the progress of bug 1169775
  • Development Synchronization is necessary: weekly meetings, or weekly mails so everybody is aware of the changes and progress in the NGA libraries.
    • AP3:Vivien sent a complete update via dev-gaia list last 19th June but we need to ensure that this sync continues after Whistler ww.
  • AP4:Create a demo branch where we can play/test the ongoing work (no for QA testing) that can help us to:
    • We have agreed creating two repos:
      • Production one: we will wait to create it when all the bugs pending to be landed in this sprint (FxOS-S1) are merged in master (specially the relative to open and new activities)
      • Development one: it will be based on Whistler demo branch: https://github.com/borjasalguero/gaia/tree/demo

Things that went well

Things that went not that well

Actions for this sprint (apart of the Sprint Objectives)