Gaia/New-Architecture-Program/Contacts/FxOS-S3(24 Jul): Difference between revisions
< Gaia | New-Architecture-Program | Contacts
Jump to navigation
Jump to search
Line 41: | Line 41: | ||
== Retrospective == | == Retrospective == | ||
=== Actions taken from last sprint === | === Actions taken from last sprint === | ||
See [https://wiki.mozilla.org/Gaia/New-Architecture-Program/Contacts/FxOS-S2%2810_Jul%29#Actions_for_this_sprint_.28apart_of_the_Sprint_Objectives.29 this link] | See [https://wiki.mozilla.org/Gaia/New-Architecture-Program/Contacts/FxOS-S2%2810_Jul%29#Actions_for_this_sprint_.28apart_of_the_Sprint_Objectives.29 this link for more info] | ||
*Raptor vs Marionette: | |||
**AP1:Check Alberto repos to verify the performance measures extracted and printed using marionette. The idea is sharing it with Raptor team. | |||
**AP2:Follow-up meeting with Eli to share with Raptor team, NGA Contacts's needs and also check the progress of bug [https://bugzilla.mozilla.org/show_bug.cgi?id=1169775 1169775] | |||
*Development Synchronization is necessary: weekly meetings, or weekly mails so everybody is aware of the changes and progress in the NGA libraries. | |||
**AP3:Vivien sent a complete update via dev-gaia list last 19th June but we need to ensure that this sync continues after Whistler ww. | |||
*AP4:Create a demo branch where we can play/test the ongoing work (no for QA testing) that can help us to: | |||
**We have agreed creating two repos: | |||
***Production one: we will wait to create it when all the bugs pending to be landed in this sprint (FxOS-S1) are merged in master (specially the relative to open and new activities) | |||
***Development one: it will be based on Whistler demo branch: https://github.com/borjasalguero/gaia/tree/demo | |||
=== Things that went well === | === Things that went well === | ||
=== Things that went not that well === | === Things that went not that well === | ||
=== Actions for this sprint (apart of the Sprint Objectives) === | === Actions for this sprint (apart of the Sprint Objectives) === |
Revision as of 12:06, 13 July 2015
General info
- Members
- Borja Salguero (DEV)
- Fernando Campo (DEV)
- Jorge Prudencio (DEV)
- Manuel Casas (DEV)
- Alberto Villena (QA)
- Maria Oteo (EPM)
- Meetings:
- Daily happening everyday in Mumble at 10:30 CEST
- Sprint Planning, on Monday (every two weeks)
- Links of interest:
Sprint objectives
Bugs for this sprint
- Pending bugs to be fixed in FxOS-S3 (24 Jul) target milestone: https://goo.gl/KP6KSC
- Pending bugs to be fixed in FxOS-S2 (24 Jul) target milestone that already have a patch: https://goo.gl/Ifucmj
No results.
0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);
Other bugs to pay attention
- List of 2.5+ bugs in Contacts: https://goo.gl/En93Ek
Daily meetings
- Tracking daily bugs in this Etherpad
Issues during the sprint
Demos
Retrospective
Actions taken from last sprint
- Raptor vs Marionette:
- AP1:Check Alberto repos to verify the performance measures extracted and printed using marionette. The idea is sharing it with Raptor team.
- AP2:Follow-up meeting with Eli to share with Raptor team, NGA Contacts's needs and also check the progress of bug 1169775
- Development Synchronization is necessary: weekly meetings, or weekly mails so everybody is aware of the changes and progress in the NGA libraries.
- AP3:Vivien sent a complete update via dev-gaia list last 19th June but we need to ensure that this sync continues after Whistler ww.
- AP4:Create a demo branch where we can play/test the ongoing work (no for QA testing) that can help us to:
- We have agreed creating two repos:
- Production one: we will wait to create it when all the bugs pending to be landed in this sprint (FxOS-S1) are merged in master (specially the relative to open and new activities)
- Development one: it will be based on Whistler demo branch: https://github.com/borjasalguero/gaia/tree/demo
- We have agreed creating two repos: