Platform/Roadmap: Difference between revisions
< Platform
Jump to navigation
Jump to search
(→WebRTC / WebAudio: re-added audio sharing and added stereo support) |
(→Media: Updated plan for Q4) |
||
| Line 404: | Line 404: | ||
* MSE - remove whitelist in Firefox 42 | * MSE - remove whitelist in Firefox 42 | ||
* MSE - support in Android and Firefox OS | * MSE - support in Android and Firefox OS | ||
------ Items above planned to be done before or during Q3 ------ | ------ Items above planned to be done before or during Q3 ------ | ||
* MP4 demuxer written in Rust | * MP4 demuxer written in Rust | ||
* | * MSE - VP9 support enabled in nightly | ||
* EME - used on a major web site in Firefox 42 | |||
------ Items above planned to be done before or during Q4 ------ | ------ Items above planned to be done before or during Q4 ------ | ||
| style="vertical-align:top;" | | | style="vertical-align:top;" | | ||
* MSE - Media Source Extensions (release Windows Vista and later/YouTube only) | * MSE - Media Source Extensions (release Windows Vista and later/YouTube only) | ||
* EME - Encrypted Media Extensions (beta 38 Windows Vista and later) | * EME - Encrypted Media Extensions (beta 38 Windows Vista and later) | ||
------ Items above | ------ Items above done before or during Q1 ------ | ||
* MSE (release Mac OSX/YouTube only) | * MSE (release Mac OSX/YouTube only) | ||
* EME (release Windows Vista and later) | * EME (release Windows Vista and later) | ||
* Video quality | * Video quality and performance improvements | ||
------ Items above done before or during Q2 ------ | |||
------ Items above | * MSE - remove whitelist in Firefox 42 | ||
* MSE | * MSE - support in Android and Firefox OS | ||
* EME | * EME - used on a major web site | ||
------ Items above planned to be done before or during Q3 ------ | |||
* MP4 demuxer written in Rust | * MP4 demuxer written in Rust | ||
* | * JS decoders | ||
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ | ------ Items above planned to be done before or during Gecko 45 (End 2015) ------ | ||
|} | |} | ||
Revision as of 01:56, 11 November 2015
| Firefox Platform 2015 Roadmap | ||
| Owner: Martin Best | Updated: 2015-11-11 | |
| This roadmap outlines the current direction for Firefox Platform development through 2015. The following document is subject to change at anytime. It is also not a commitment to ship a features but rather an intent to implement and land them on by default in the nightly version of Firefox unless otherwise stated. | ||
Related Links:
Teams
Definition of Done: All listed features are present in our nightly version of Firefox. The features must then go through the standard quality assurance process before appearing in a release channel.
Accessibility
| Current Plans | Previous Plans |
|---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------
|
[everything below not finalized]
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
DOM
| Current Plans | Previous Plans |
|---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
e10s
| Current Plans | Previous Plans |
|---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Q1 ------ ------ Items above planned to be done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------ |
Graphics
| Current Plans | Previous Plans |
|---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
JavaScript
| Current Plans | Previous Plans |
|---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------ ------ Items above planned to be done before or during Q3 ------ ------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Layout
| Current Plans | Previous Plans |
|---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------ ------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------
------ Items above planned to be done before end 2015 but may get reprioritized ------ |
Media
| Current Plans | Previous Plans |
|---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------ |
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Mobile Platform
| Current Plans | Previous Plans |
|---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------ ------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Networking
| Current Plans | Previous Plans |
|---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
PKI
| Current Plans | Previous Plans |
|---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------
|
|
Sandboxing
| Current Plans | Previous Plans |
|---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------ ------ Items above planned to be done before or during Q4 ------
|
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Security
| Current Plans | Previous Plans |
|---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------ |
------ Items above were done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
WebRTC / WebAudio
(All these features/fixes below are landing in Nightly during these quarters)
| Current Plans | Previous Plans |
|---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------
|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------
------ Items above planned to be done before or during Q3 ------
------ Items above planned to be done before or during Q4 ------
|
Web Compatibility
| Current Plans | Previous Plans |
|---|---|
------ Items above done before or during Q1 ------
------ Items above done before or during Q2 ------ ------ Items above planned to be done before or during Q3 ------ ------ Items above planned to be done before or during Q4 ------ |
------ Items above planned to be done before or during Gecko 39 (Q1) ------
------ Items above planned to be done before or during Gecko 42 (Q2) ------
------ Items above planned to be done before or during Gecko 45 (End 2015) ------ |
Initiatives
- 60fps
- Focused on producing a smooth, jank free experiences. 60fps goal is dependant on media type.
- BarrierSmash
- Ensure that accessibility features are working throughout our products.
- Candle
- Program targeted at reducing energy usage.
- CrashKill
- Improve the overall stability of Gecko and the project that rely on it.
- CritSmash
- Fix known critical security bugs.
- Electrolysis
- This is focused on providing multi-process browser (aka e10s).
- Offline
- Offline Support
- Presto
- Program targeted at improving overall load times and performance. This is resurrecting an older program that was discontinued.
- MemShrink
- Reduce memory usage (all products)
- Web Compatibility
- Improve the overall web compatibility of Gecko.
- Webify
- Reduce the webs dependence on plugins. This includes several content targeted initiatives such as the games program (Unity), Shumway (Flash), MSE/EME, WebRTC (Google Talk, Facebook Video)
- Games Program