Thunderbird:Participation:2011 Goals:General: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
(→Q1) |
||
| Line 10: | Line 10: | ||
* overhaul Thunderbird top-level contribution funnel | * overhaul Thunderbird top-level contribution funnel | ||
** spearhead wikimo analytics | ** spearhead wikimo analytics | ||
** February: prototype design & feedback/metrics loop, | ** February: prototype design & feedback/metrics loop (CHANGED) | ||
** March: deploy/iterate _quickly_ | *** did a bunch of research, talking to dboswell about working together | ||
** March: deploy/iterate _quickly_ (NEEDS ADJUSTMENT) | |||
<i>Q2-Q4 goals are tentative; to be refreshed at end of Q1</i> | <i>Q2-Q4 goals are tentative; to be refreshed at end of Q1</i> | ||
== Q2 == | == Q2 == | ||
* support area leads in [[Thunderbird:Participation:2011 Goals|their goals]] | * support area leads in [[Thunderbird:Participation:2011 Goals|their goals]] | ||
Revision as of 19:18, 1 March 2011
This is a straw man version. These goals are being driven by dmose, who is working with the area leads to ensure that the various area goals lead to and are compatible with these goals.
- Attract X new contributors to the community
- 4 iterations on Tb contribution funnels
Q1
- support area leads in their goals
- overhaul Thunderbird top-level contribution funnel
- spearhead wikimo analytics
- February: prototype design & feedback/metrics loop (CHANGED)
- did a bunch of research, talking to dboswell about working together
- March: deploy/iterate _quickly_ (NEEDS ADJUSTMENT)
Q2-Q4 goals are tentative; to be refreshed at end of Q1
Q2
- support area leads in their goals
- iterate on top-level funnel page
Q3
- support area leads in their goals
- work with area FOO to create an area-specific funnel
Q4
- support area leads in their goals
- work with area FOO to iterate on funnel created last quarter