QA/Execution/Meetings/2008-05-15
Jump to navigation
Jump to search
« previous mtg | index | next mtg »
Discussion Items
- Central Feedback system for branch (abillings)
- No current hendrix-type feedback in place now
- Right now, for branch, we have to scour mozillazine, newsgroups, QMO, and blogs to look for feedback.
- EV server update (marcia)
- Past discussion: IT setup server, Juanb setup the app
- Marcia to follow up with Bob lord to figure out final requirements
- Possibly a security testing summit?
- need a litmus server to throw permanent testcases against it (Stephend / Coop to figure out specs)
- Past discussion: Need some static tests for storage
- Three things:
- A) coop has set up a repo at mozilla/webtools/litmus/testcase_files, which gets mirrored out to https://litmus.mozilla.org/testcase_files/
- B) Just need to come up with a directory structure within this (not sure this is the right time to have a meeting for this), and then each do C, below:
- C) We'll need to all get CVS checkin access to this repository (to land--shouldn't have just a few people responsible for landing testcases, I don't think?), but that's an easily filed IT bug (per person). -- stephend
- Eggplant tests need to be ran here also. currently running off bc's box
- We need another machine? Figure out source code control.
- Limited bandwidth and proxy testing (jay, tomcat)
- bug 23459 - (squid) – install a WWW-proxy (squid 2.0) that can be used to limit bandwidth
- Choffman asking for more proxy testing, bandwidth throttling. Who to drive this?
Project Updates
- Firefox 3 (tchung)
- RC1 testing
- Targetting early release on friday, 5/15
- This will be a partial signoff by QA, to pre-launch for beta community
- RC1 testing
- Fx 2.0.0.15 update (al)
- Leak testing update (tomcat)
- Webdev update (stephend)
- AMO 3.4.2 (bugs) on-track to ship during Thursday night's IT maintenance window
- Community update (jay)
- Working with legal to finalize contract with http://www.advomatic.com/, who will be working on the QMO2 development project, hopefully starting before end of May.
- Organizing QMO2 content creation project, be ready to sign up for sections of the site to gather and write content. I will be using basecamp to track progress.
- Finishing betatesters survey design/setup, will be going live early next week.
- Testday this week on RC1 Part 1 (tchung) is the topic moderators this week.
- Moderator rotation list
- 7am-11am (Tomcat / Martijn)
- 11am-1pm (overlapping testers)
- 1pm-5pm (Marcia / Tchung)
- Moderator rotation list
Other topics?