Gaia/New-Architecture-Program/Contacts/FxOS-S3(24 Jul)

From MozillaWiki
Jump to navigation Jump to search

General info

  • Members
    • Borja Salguero (DEV)
    • Fernando Campo (DEV)
    • Jorge Prudencio (DEV)
    • Manuel Casas (DEV)
    • Alberto Villena (QA)
    • Maria Oteo (EPM)
  • Meetings:
    • Daily happening everyday in Mumble at 10:30 CEST
    • Sprint Planning, on Monday (every two weeks)
  • Links of interest:

Sprint objectives

As part of the cycle 2 in the porting of Contacts app to the NGA, our main targets are:

  • Integrate #new within Contacts app in master:
    • Ensuring that all is working fine via windows.open
      • Moving all the logic related to 'curtain' to a Panel (currently is a separate <iframe>) (Bug 1182484)
      • Create a 'matching' view in a separated .html (matching_contacts.html) to remove all the dependencies (Bug 1181996)
      • Open contacts_matching with window.open instead of an i-frame. (Bug 1182509)
    • Final version of the navigation (gaia component) ready
    • Include #new in Contacts app using navigation (merged in /shared folder)
  • Merge #update activity in master as a self contained view
  • First version of #open and #import activities agreed during last sprint, they will be merged to unify the code and the offered UI.
    • We need to divide the work and assign tasks (Fer/Manu)
  • Crazy ideas & Improvements: propose ideas for the NGA ww for Contacts or other Gaia applications. It's a nice to have in the sprint.

Bugs for this sprint

No results.

0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);


Other bugs to pay attention

Daily meetings

Issues during the sprint

  • First version for removing Contacts from Communications.

Demos

Retrospective

Actions taken from last sprint

See this link for more info

  • Raptor vs Marionette:
    • AP1:Check Alberto repos to verify the performance measures extracted and printed using marionette. The idea is sharing it with Raptor team.
    • AP2:Follow-up meeting with Eli to share with Raptor team, NGA Contacts's needs and also check the progress of bug 1169775
  • Development Synchronization is necessary: weekly meetings, or weekly mails so everybody is aware of the changes and progress in the NGA libraries.
    • AP3:Vivien sent a complete update via dev-gaia list last 19th June but we need to ensure that this sync continues after Whistler ww.
  • AP4:Create a demo branch where we can play/test the ongoing work (no for QA testing) that can help us to:
    • We have agreed creating two repos:
      • Production one: we will wait to create it when all the bugs pending to be landed in this sprint (FxOS-S1) are merged in master (specially the relative to open and new activities)
      • Development one: it will be based on Whistler demo branch: https://github.com/borjasalguero/gaia/tree/demo

Things that went well

Things that went not that well

Actions for this sprint (apart of the Sprint Objectives)