Mobile/Notes/17-Mar-2010
Jump to navigation
Jump to search
Details
- Wednesdays - 9:30am Pacific, 12:30pm Eastern, 17:30 UTC
- 650-903-0800 or 650-215-1282 x92 Conf# 8605 (US/INTL)
- 1-800-707-2533 (pin 369) Conf# 8605 (US)
- irc.mozilla.org #mobile for backchannel
Schedule
[ https://wiki.mozilla.org/Releases ]
- Onward to 1.1
Major Topics for This Week
- Start sprinting on tasks
- Began investigating and building e10s
- Can we drop chinook
Front-end
- P1 status:
- Auto-updating add-ons landed
- View all add-ons is ready to start
- Start page design is underway
- Tapping links is waiting for more input
- P2 status:
- Many patches in second review
- Web theme has some performance issues
- Collecting patches that will require string changes
- Starting some platform work this week and next
UX design
Maemo
Qt
Windows Mobile
Android
Electrolysis
General Platform
Geolocation support
Video
Camera
Plugins
Performance
Networking
Graphics
Startup
Layout
Content
Release Engineering
- bug 550023 1.0.1 blockers
- bug 544605 partner repack
- release updates/test run
- bug 538699 needs to land on relbranch for l10n repacks
- winmo updates
- tools/update-packaging ?
- winmo tests
- winmo symbols/mozconfig change
- maemo 5 builds
- n900s
- n810s
- browser chrome tests
- android builds
- monday meeting
QA
Manual
- notes
- bugs filed to look at
- litmus testcases added
- the extra status updates on 1.1 features and new things upcoming have been really helpful
- requests
- when are we having a triage meeting?
- goals for the upcoming week
- run smoketests for 1.9.2 winmo and maemo, trunk for winmo and maemo
- add testcases for new feature lands: bug 551709
Automation
- Initial winmo unittests are checked into mozilla-central, and handoff to releng is in process
- small fixes around timeouts and reftest chunking need to land later this week
- Other projects include the mochitest-chrome style tests, moving functionality from buildbot scripts to harnesses for easier running by developers and building a list of failed test cases
- I would expect by the end of the month to have a few end to end runs under our belt with some bugs filed for specific test cases.
- Still working (slowly) on [greening the maemo tests]
Other
- Happy St. Patrick's day