Webmaker/Landing Pages

From MozillaWiki
Jump to navigation Jump to search

bhnglj-v.png

Notes

Goals

  • Increase our conversion rate. Of visitors to users, from 3% to 6%.
  • Customize our story for key audiences. Especially Mozilla.org visitors and Firefox snippet-clickers.
  • Provide the right CTAs. This is crucial. "Find or host an event" alienates a ton of traffic -- we need to test better CTAs.
  • Bring science. Rigorously test and optimize our ability to turn Mozilla traffic into users and contributors.

What we're shipping in Q2

  • 1) A landing page for mozilla.org referral traffic.
    • Webmaker get tons of traffic from the mozilla.org front page. We can increase the conversion rate of that traffic by creating a custom landing page for Mozilla.org referrals.
  • 2) A Firefox snippet landing page.
    • We'll get a Maker Party Firefox snippet in July. We need a landing page and CTAs that is tailor-made for this audience.
  • 3) The right calls to action for these pages.
    • We need to think more creatively about our CTAs for these pages. This might require thinking and creating something new. It could be a quiz, could be something else -- so let's call it out as a key deliverable.
  • Plus some additional lower-priority deliverables listed here:

https://etherpad.mozilla.org/landing-pages

Links & documentation

Roles

  • Mozilla.org landing page
    • R: A: C: I:
  • Firefox snippet landing page
    • R: A: C: I:
  • Whitehouse landing page
    • R: A: C: I:
  • New Maker Party CTAs
    • R: A: C: I:

Sprints

May 16

No results.

0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);

May 23

No results.

0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);

All landing page tickets currently filed

  • We need to vet these and make sure they're up to date with current thinking. Then triaged into bi-weekly sprints.

No results.

0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);

Sprint: Build testable variants

The goal of this sprint is to design, build, and demo 4 different pages in order to test them with optimizely in a future sprint.

  • Whiteboard: [2014makerparty] [landingpages]
  • Who's responsible: Aki & Kate
  • Target completion date: May 16th
  • Etherpad: wm-runway

No results.

0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);

Sprint: Test and decide on winner

During this sprint, we will deploy the landing pages to production, and watch the results from optimizely. We will present our results after 2 weeks.

  • Whiteboard: [2014makerparty][landingpages-data-round-1]
  • Who's responsible: Aki & Kate
  • Target completion date: May 30

No results.

0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);

Sprint: Final iteration

During this sprint, we will use optimizely results to iterate and refine the best design until the June 15 announcement.

  • Whiteboard: [2014makerparty][landingpages-followup]
  • Who's responsible: Aki & Kate
  • Target completion date: June 15

No results.

0 Total; 0 Open (0%); 0 Resolved (0%); 0 Verified (0%);