Firefox/Goals/2009Q2

From MozillaWiki
< Firefox‎ | Goals
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
  • [DONE] Ship Firefox 3.5
  • evaluation notes:
    • shipped on June 30th
  • [DONE] Make Firefox observably faster on all platforms for startup, shutdown, opening a new tab, and looking up a match in the Awesomebar
    • dependencies on QA/releng: requires some automated way of measuring and reporting Topentab, Tawesomebarlookup, Tbeachball, Tloadlink, etc
  • evaluation notes:
    • changes happened on mozilla-central
    • feels faster, but interestingly not showing up in usual metrics
    • need to investigate this in the future
  • [MISSED] Make Firefox feel more responsive
    • identify and ensure that all actions have some user visible feedback (such as an animation or action completion) within 100ms
  • evaluation notes:
    • list generated, but due to focus on shipping Firefox 3.5 and previous goal for making Firefox faster, didn't finish the work
    • will focus on these issues next quarter
  • [DONE] Make it easier to extend and theme Firefox
    • improve our default theme structure
    • improve APIs in browser services (Places, wallet, tabbrowser?) for add-ons
    • simple add-on structure for site-specific scripting
  • evaluation notes:
    • worked with Labs team on Personas (theme) and JetPack (extensions)
  • [DONE] Polish user experience
    • identify and prioritize polish bugs and fix all P1s
    • finish UI work that was pushed out of Firefox 3 and Firefox 3.1 (ex: Library, Awesomebar result pages, site-specific function in identity button)
  • evaluation notes:
    • calling this goal done, although it wasn't hit 100% of the way
    • identified polish bugs and created tracking system
    • fixed majority of P1 polish issues
  • [DONE] Complete Firefox.next plan
    • outline scheduled milestones
    • documentation that clearly scopes feature work and designs
  • evaluation notes:
    • done early in the quarter