Meeting Info

Breakpad status meetings occur on Wed at 10:00am Pacific Time.

Conference numbers:

   Vidyo: Stability 
   650-903-0800 x92 conf 98200#
   800-707-2533 (pin 369) conf 98200# 

IRC backchannel: #breakpad
Mountain View: Dancing Baby (3rd floor)

Operations Updates

  • we didn't do a -prod deploy last week (sadface)
  • this is a release week, so we're not doing a -prod deploy this week
  • elasticsearch migration
    • we now have a working ES 5.3 cluster in ops infrastructure for prototyping reindex-from-remote
    • working on migrating data--should be ready today
    • miles put the cluster behind a NAT server to reach out into webeng environment
  • infrastructure migration
    • working on getting webapp and processor working in ops environment
  • symbols
    • environments for load test are built
    • logging and systemtest have issues still
  • priority adjustment -- elasticsearch has to go out asap
    • we need to reduce the amount of work to get ES out as much as possible
    • we're going to just reserve the -stage environment for a week -- no new dev, no merges, no nothing unless it's ES related
    • adrian is switching projects so peterbe/willkg will fill in
  • elasticsearch keeps blowing up and we want metrics on the size of documents going in
    • willkg will write up bug to add metrics for document sizes

Security Updates

QA Updates

  • grumpy started his first load tests of symbol server. Currently blocked waiting on confirmation that fix for NoSuchBucket has been implemented and pushed to the staging environment
  • talked to tarek about adding incremental load ramping to molotov (https://github.com/loads/molotov/issues/61)
  • setting up a spreadsheet for tracking load testing on tecken

Project Updates

Deployment Triage

PR Triage

Major Projects

Deprecation rampage

  • (Adrian) it seems we can run our django web app with just about 11 tables (that is, if we remove 3 useless features)
    • compare that to the ~160 tables we currently have in our database
    • that's not counting django-related tables (stuff like auth, meta-data, etc. )
  • started experimenting with managing those tables inside django
  • adrian will do a braindump in some good place and put into bugs at some point
  • willkg can "take over" this project because it's related to processor work, but he will probably put this on hold for a bit

Processor rewrite

  • (willkg) continued working on the spec; going through existing Processor and spec'ing out all the parts and working on reducing Phase 1 of the rewrite to bare minimum

Upgrading elasticsearch

Covered in ops update.

Symbol Server 2017

Other Business

  • Adrian is moving to work on Pontoon, starting soon
    • deprecation rampage -> willkg/peterbe
    • elasticsearch update -> willkg/miles
    • will be gone for 1-3 months or something like that
  • STICKERS!

Travel, etc

  • mbrandt, PTO 6/16
  • miles, PTO (6/14, 6/15)
  • willkg, PTO (7/10 -> 7/14)
  • grumpy, PTO for August