TPE DOM/Date time input types: Difference between revisions

Line 56: Line 56:
| Determine locale for the date/time || Could be 1. Browser UI locale  2. User preferred locale || Open ||
| Determine locale for the date/time || Could be 1. Browser UI locale  2. User preferred locale || Open ||
|-
|-
| Identify scope Bug 1280654 and owner  || CLDR access needed for both front-end and platform module || WIP || Discuss on bug 1280654
| Identify scope Bug 1280654 and owner  || CLDR access needed for both front-end and platform module || DONE|| Discuss on bug 1280654; Target by Aug/M.
|-
| Front-end architecture plan || Identify front-end reviewer and get architecture plan reviewed  || WIP|| Scott working on it.
|-
| Layout architecture plan || Identify layout reviewer and get architecture plan reviewed  || WIP|| Jessica working on it.
|-
|-
| UX spec lock-down  || Get sign-off in the critique || DONE || https://mozilla.invisionapp.com/share/237UTNHS8#/screens/171579739
| UX spec lock-down  || Get sign-off in the critique || DONE || https://mozilla.invisionapp.com/share/237UTNHS8#/screens/171579739
Line 62: Line 66:
| Project master schedule (Proposal)  || proposal for 2016H2|| DONE || Living schedule for 20162H available in https://goo.gl/wwLYf3  (permission required)
| Project master schedule (Proposal)  || proposal for 2016H2|| DONE || Living schedule for 20162H available in https://goo.gl/wwLYf3  (permission required)
|-
|-
| Project master schedule  || master plan sign off|| OPEN || Action: adding QA timeline
| Project master schedule  || master plan sign off|| WIP || Action: confirm with stakeholders
|-
|-
|}
|}
Confirmed users
628

edits