761
edits
Jprosevear (talk | contribs) |
Jprosevear (talk | contribs) |
||
| Line 82: | Line 82: | ||
=== Builds === | === Builds === | ||
* Are beta channel builds signed? | * Are beta channel builds signed? | ||
=== Security Updates [chofmann, dveditz, legneato] === | |||
* the priority is last release branch | |||
** we fix on all branches | |||
* needs follow up on shadow repo possibilities | |||
=== Updates === | |||
* Current proposal is no 5.0.x, 6.0.x etc updates other than chemspills | |||
** based off the 6 week m-c pull cycle | |||
** each release can be marketed in a different way | |||
* Needs re-evaluation at FF6 to mozilla-experimental pull | |||
== Meetings == | == Meetings == | ||
| Line 112: | Line 123: | ||
* the first merges will be manageable | * the first merges will be manageable | ||
=== Feature Planning [dria] === | === Feature Planning [dria] === | ||
edits