Auto-tools/Projects/SfN 2013Q2: Difference between revisions

No edit summary
Line 34: Line 34:
* {{ok| (depends on ui for time course) Back fill schema with data for all projects and deploy to production}}
* {{ok| (depends on ui for time course) Back fill schema with data for all projects and deploy to production}}
* Work out how to get try reporting to Datazilla by using mozilla-central as a base for the pushlog (this gives us an 80% usecase)
* Work out how to get try reporting to Datazilla by using mozilla-central as a base for the pushlog (this gives us an 80% usecase)
** Deploy try integration as a data source.
** {{risk|Deploy try integration as a data source.}}
* Begin analyzing data to optimize statistics for regression detection on each desktop Talos test (we are pretty good for tp5o, we need to look into Ts, Tsvg* and others
* {{risk|Begin analyzing data to optimize statistics for regression detection on each desktop Talos test (we are pretty good for tp5o, we need to look into Ts, Tsvg* and others}}


=== Milestone 4 -  2 weeks (planned) ===
=== Milestone 4 -  2 weeks (planned) ===