Confirmed users
513
edits
Klahnakoski (talk | contribs) |
Klahnakoski (talk | contribs) |
||
| Line 70: | Line 70: | ||
[[ File:Auto-tools_Projects_Alerts_Mtest_and_ttest.png|800px|none|Eideticker time series]] | [[ File:Auto-tools_Projects_Alerts_Mtest_and_ttest.png|800px|none|Eideticker time series]] | ||
The blue circles are the Eideticker time series, red points are the t-test score, and the green line is the median test score. The Eideticker data is a good example of some of the smallest regressions that can be detected. | The blue circles are the Eideticker time series, red points are the t-test score, and the green line is the median test score. The Eideticker data is a good example of some of the smallest regressions that can be detected. In this example, the median score threshold is set to 2 (p-value < 0.01), and the t-test score threshold is set to 4 (p-value < 0.0001). First, the median test is used to detect (m-score > 2) three discontinuities: Two regressions and one improvement. Second, all the high t-test scores (red) surrounding the detected regression are considered candidates, and the highest is of those is considered the beginning of the discontinuity. | ||