Firefox OS/DeviceQA/2014-09-15WeeklyReport: Difference between revisions

m
Lakrits moved page FirefoxOS/DeviceQA/2014-09-15WeeklyReport to Firefox OS/DeviceQA/2014-09-15WeeklyReport: The official spelling of "Firefox OS" leaves a space between the two parts of the name. It's easier to find a page if the spelling of it...
No edit summary
m (Lakrits moved page FirefoxOS/DeviceQA/2014-09-15WeeklyReport to Firefox OS/DeviceQA/2014-09-15WeeklyReport: The official spelling of "Firefox OS" leaves a space between the two parts of the name. It's easier to find a page if the spelling of it...)
 
(12 intermediate revisions by 9 users not shown)
Line 3: Line 3:
{| class="wikitable" class="fullwidth-table" border="1"
{| class="wikitable" class="fullwidth-table" border="1"
|-
|-
! align="center" style="width: 10;" | Name
! align="center" style="width: 10%;" | Name
! align="center" style="width: 45%;" | Done
! align="center" style="width: 45%;" | Done
! align="center" style="width: 45%;" | Plan
! align="center" style="width: 45%;" | Plan
Line 24: Line 24:
**Execute [Woodduck] RAT test - Round 2
**Execute [Woodduck] RAT test - Round 2
**Take care of Flame v2.0 automation reports
**Take care of Flame v2.0 automation reports
**Clarify and reproduce Woodduck issues on Flame (http://goo.gl/W577ka)
||
||
* Week W39 (09/22~09/26):
* Week W39 (09/22~09/26):
**Clarify and reproduce Woodduck issues on Flame (http://goo.gl/W577ka)
|-
|-
| Gerry
| Gerry
Line 33: Line 35:
**Finish testing for bug 1024776
**Finish testing for bug 1024776
||
||
* Week W39 (09/22~09/26):  
* Week W39 (09/22~09/26):
**Test App usage metrics
**Finish EU-support test
**Verify 2.1 bugs
|-
|-
| Mike
| Mike
||
||
* Week W38 (09/15~09/19):
* Week W38 (09/15~09/19):
**Categorize test cases from version tags (cont.)
**Categorize test cases from version tags (100%)
**Test case mind map creation
**Test case mind map creation
**Flame KK v2.0 base image verification
**Flame KK v2.0 base image verification
Line 48: Line 53:
||
||
* Week W39 (09/22~09/26):
* Week W39 (09/22~09/26):
**Test case mind map creation
**Tarako power drain issue follow up
**Madai bug verification
**Project management training
|-
|-
| eric
| eric
Line 57: Line 66:
||
||
* Week W39 (09/22~09/26):
* Week W39 (09/22~09/26):
** Test Run for RIL
** Exploratoy against v2.1
** Feature page index for OS
** Verification of bugs before FC
** Fixing RIL/COMMS test cases
|-
|-
| Paul
| Paul
Line 63: Line 77:
* Add cpu usage in mtbf
* Add cpu usage in mtbf
* Sync-up with release management
* Sync-up with release management
||
* bug 1064800 - Re-test on master and v2.1
* Fix test case error
* Trigger full run on v2.1
* Modify crash report patch based on review
-- backlog --
-- backlog --
* Modify crash report patch based on review
* Followup live test run stream
* Followup live test run stream
* Datazilla integration
* Datazilla integration
* Bug fix for in-testcase logging
* Bug fix for in-testcase logging
||
|-
|-
| William Hsu
| William Hsu
Line 107: Line 123:
||
||
* Week W39 (09/22~09/26)
* Week W39 (09/22~09/26)
** Bugs verification
** [Bluetooth] Update test cases at mozrtrap
|-
|-
| Al
| Al
Line 112: Line 130:
* Week W38 (09/15~09/19)
* Week W38 (09/15~09/19)
** MCTS for v2.0/v2.1 study
** MCTS for v2.0/v2.1 study
** Woodduck weeekly triage
||
||
* Week W39 (09/22~09/26)
* Week W39 (09/22~09/26)
** Woodduck weekly triage
** Privacy Panel Feature for v2.1
** MCTS for v2.0/v2.1
** Monkey Test
|-
|-
| Walter Chen
| Walter Chen
Line 138: Line 161:
** Test copy-paste feature for v2.1 (Bug 1023688)
** Test copy-paste feature for v2.1 (Bug 1023688)
** Automate P1 test cases for copy-paste
** Automate P1 test cases for copy-paste
|-
| Edward
|
* Week W38 (09/15~09/19)
** Testing - App to App https://bugzilla.mozilla.org/show_bug.cgi?id=1037468 (100%)
** Copy-Paste bug bash
** Test/ verify sprint 4 tickets
||
* Week W39 (09/22~09/26)
** Test/ verify sprint 5 tickets
** Plan rearrangement resource for feature owner.
** Smoke test for productivity apps with KK image
|-
| Askeing
|
* Week W38 (09/15~09/19)
** Investigate the MCTS.
** Develop the flashing tools.
** Prepare the information of outsourcing.
||
* Week W39 (09/22~09/26)
** Develop the combo-runner framework.
** Investigate the MCTS.
** Fix the building/testing jobs on CI server.
** Develop the flashing tools.
** Prepare the information of outsourcing.
3,860

edits