Firefox OS/DeviceQA/2014-09-15WeeklyReport: Difference between revisions

m
Lakrits moved page FirefoxOS/DeviceQA/2014-09-15WeeklyReport to Firefox OS/DeviceQA/2014-09-15WeeklyReport: The official spelling of "Firefox OS" leaves a space between the two parts of the name. It's easier to find a page if the spelling of it...
No edit summary
m (Lakrits moved page FirefoxOS/DeviceQA/2014-09-15WeeklyReport to Firefox OS/DeviceQA/2014-09-15WeeklyReport: The official spelling of "Firefox OS" leaves a space between the two parts of the name. It's easier to find a page if the spelling of it...)
 
(7 intermediate revisions by 5 users not shown)
Line 3: Line 3:
{| class="wikitable" class="fullwidth-table" border="1"
{| class="wikitable" class="fullwidth-table" border="1"
|-
|-
! align="center" style="width: 10;" | Name
! align="center" style="width: 10%;" | Name
! align="center" style="width: 45%;" | Done
! align="center" style="width: 45%;" | Done
! align="center" style="width: 45%;" | Plan
! align="center" style="width: 45%;" | Plan
Line 24: Line 24:
**Execute [Woodduck] RAT test - Round 2
**Execute [Woodduck] RAT test - Round 2
**Take care of Flame v2.0 automation reports
**Take care of Flame v2.0 automation reports
**Clarify and reproduce Woodduck issues on Flame (http://goo.gl/W577ka)
||
||
* Week W39 (09/22~09/26):
* Week W39 (09/22~09/26):
**Clarify and reproduce Woodduck issues on Flame (http://goo.gl/W577ka)
|-
|-
| Gerry
| Gerry
Line 33: Line 35:
**Finish testing for bug 1024776
**Finish testing for bug 1024776
||
||
* Week W39 (09/22~09/26):  
* Week W39 (09/22~09/26):
**Test App usage metrics
**Finish EU-support test
**Verify 2.1 bugs
|-
|-
| Mike
| Mike
Line 64: Line 69:
** Exploratoy against v2.1
** Exploratoy against v2.1
** Feature page index for OS
** Feature page index for OS
** Verification of bugs before FC
** Fixing RIL/COMMS test cases
|-
|-
| Paul
| Paul
Line 116: Line 123:
||
||
* Week W39 (09/22~09/26)
* Week W39 (09/22~09/26)
** Bugs verification
** [Bluetooth] Update test cases at mozrtrap
|-
|-
| Al
| Al
Line 164: Line 173:
** Plan rearrangement resource for feature owner.
** Plan rearrangement resource for feature owner.
** Smoke test for productivity apps with KK image
** Smoke test for productivity apps with KK image
|-
| Askeing
|
* Week W38 (09/15~09/19)
** Investigate the MCTS.
** Develop the flashing tools.
** Prepare the information of outsourcing.
||
* Week W39 (09/22~09/26)
** Develop the combo-runner framework.
** Investigate the MCTS.
** Fix the building/testing jobs on CI server.
** Develop the flashing tools.
** Prepare the information of outsourcing.
3,860

edits