3,860
edits
(Created page with " Last week | Next week {| class="wikitable" class="fullwidth-table" border="1"...") |
m (Lakrits moved page FirefoxOS/DeviceQA/2014-09-22WeeklyReport to Firefox OS/DeviceQA/2014-09-22WeeklyReport: The official spelling of "Firefox OS" leaves a space between the two parts of the name. It's easier to find a page if the spelling of it...) |
||
(13 intermediate revisions by 8 users not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable" class="fullwidth-table" border="1" | {| class="wikitable" class="fullwidth-table" border="1" | ||
|- | |- | ||
! align="center" style="width: 10;" | Name | ! align="center" style="width: 10%;" | Name | ||
! align="center" style="width: 45%;" | Done | ! align="center" style="width: 45%;" | Done | ||
! align="center" style="width: 45%;" | Plan | ! align="center" style="width: 45%;" | Plan | ||
|- | |- | ||
| | | Hubert | ||
|| | || | ||
* Week W39 (09/22~09/26): | |||
|| | || | ||
| | |||
|- | |||
| Cynthia | |||
|| | |||
* Week W39 (09/22~09/26): | |||
**Take care of Flame KK v2.0 automation reports | |||
**Clarify and reproduce Woodduck issues on Flame (http://goo.gl/W577ka) | |||
|| | |||
* Week W40 (09/29~10/03): | |||
**Take care of Flame KK v2.0 automation reports | |||
**Clarify and reproduce Woodduck issues on Flame (http://goo.gl/W577ka) | |||
|- | |||
| Gerry | |||
|| | |||
* Week W39 (09/22~09/26): | |||
**Test App usage metrics | |||
**Finish EU-support test | |||
**Verify 2.1 bugs | |||
|| | |||
|- | |||
| Mike | |||
|| | |||
* Week W39 (09/22~09/26): | |||
**Test case mind map creation | |||
**Tarako power drain issue follow up | |||
**Madai bug verification | |||
**Project management training | |||
|| | |||
* Week W40 (09/29~10/03): | |||
**Flame base image verification: v184 | |||
**Madai bug verification | |||
**Extend Orangutan capability | |||
**3rd party app performance measurement | |||
|- | |||
| eric | |||
|| | |||
* Week W39 (09/22~09/26): | |||
** Test Run for RIL | |||
** Exploratoy against v2.1 | |||
** Feature page index for OS | |||
** Verification of bugs before FC | |||
** Fixing RIL/COMMS test cases | |||
|| | |||
* Week W40 (09/29~10/03): | |||
** Exploratoy against v2.1 | |||
** Feature page index for OS | |||
** Verification of bugs before CC | |||
** Fixing SMS/STK test cases | |||
** Reviewing smoke test case | |||
|- | |||
| Paul | |||
|| | |||
* bug 1064800 - Re-test on master and v2.1 | |||
* Fix test case error | |||
* Trigger full run on v2.1 | |||
|| | |||
* bug 1064800 | |||
* Setup device for flame_kk | |||
* Workaround for v2.0 software home button | |||
* Fix test case error | |||
* Patch for reusing marionette instance | |||
* Trigger custom build run for patch 1064800 | |||
* Modify crash report patch based on review | |||
-- backlog -- | |||
* Followup live test run stream | |||
* Datazilla integration | |||
* Bug fix for in-testcase logging | |||
|- | |||
| William Hsu | |||
| | |||
*'''Week W39 (09/22~09/26)''' | |||
** [Routine] Bug replication, submission, and verification. | |||
*** 24 bug from the time of the writing of this (Ref: http://goo.gl/LzACcg) | |||
** [Device] Assist device related tests - Tako | |||
*** Smoketest on Tako (ETA:9/25) | |||
*** Gaia UI test on Tako (ETA:9/23) | |||
*** Test strategy for CAF ES2 build (v2.0) | |||
*** Prepare All-in-one test machine/VM for partner (Part I: Packages installation 9/26) | |||
*** Weekly meeting with partner (9/23) | |||
***# Address automation test related problems | |||
***# Three-way synchronization with partners (progress) | |||
** [Device] Assist device related tests - Flame | |||
*** Prepare jobs for Flame KK | |||
*** Gaia UI test on v2.0 Build | |||
*** Analyze problem of rescue tool | |||
| | |||
*'''Week W40 (09/29~10/03)''' | |||
** [Device] Assist device related tests - Tako | |||
*** Prepare All-in-one test machine/VM for partner (Part II: System Configuration 9/29~9/30) | |||
*** Smoketest on Tako (ETA:10/02) | |||
*** Gaia UI test on Tako (ETA:9/30) | |||
*** Weekly meeting with partner (9/30) | |||
***# Three-way synchronization (project status) | |||
** [Device] Assist device related tests - Flame | |||
**# Gaia UI test on v2.0 Build | |||
**# v2.0 Bug verification (verifyme) (Ref: http://goo.gl/EyMRDn) | |||
|- | |||
| Alison Shiue | |||
| | |||
* Week W39 (09/22~09/26) | |||
** Bugs verification | |||
** [Bluetooth] Update test cases at mozrtrap | |||
|| | |||
|- | |||
| Al | |||
| | |||
* Week W39 (09/22~09/26) | |||
** Woodduck weekly triage | |||
** Privacy Panel Feature for v2.1 | |||
** MCTS for v2.0/v2.1 | |||
** Monkey Test | |||
|| | |||
|- | |||
| Walter Chen | |||
| | |||
* Week W39 (09/22~09/26) | |||
** Bug solving for mtbf | |||
** MTBF test runs*2 | |||
** interviews | |||
|| | |||
|- | |||
| Shing | |||
| | |||
* Week W39 (09/22~09/26) | |||
** Apps usage metrics testing | |||
** Cost Control testing | |||
** Cost Control test cases design | |||
** Cost Control performance regression investigation | |||
|| | |||
*Week W40 (09/29~10/03) | |||
** Cost Control test cases design | |||
** Apps usage metrics test cases design | |||
** Read ''Pragmatic Software Testing'' | |||
** Prepare sharing on how to submit app to Firefox Marketplace | |||
|- | |||
| Edward | |||
| | |||
* Week W39 (09/22~09/26) | |||
** Test/ verify sprint 5 tickets | |||
** Plan rearrangement resource for feature owner. | |||
** Smoke test for productivity apps with KK image | |||
|| | |||
|- | |||
| Askeing | |||
| | |||
* Week W39 (09/22~09/26) | |||
** Develop the combo-runner framework. | |||
** Investigate the MCTS. | |||
** Fix the building/testing jobs on CI server. | |||
** Develop the flashing tools. | |||
** Prepare the information of outsourcing. | |||
| | |||
*Week W40 (09/29~10/03) | |||
** Investigate the MCTS. | |||
** Develop the flashing tools for MTBF. | |||
** Prepare the information of outsourcing. | |||
** Follow up the Card UI user story. | |||
| |
edits