Partnering:Projects:BYOB:Meetings:2010-02-17: Difference between revisions
Jump to navigation
Jump to search
LesOrchard (talk | contribs) (Created page with '__TOC__ = Open Items = * [http://tinyurl.com/byobopen1 Open bugs] * [http://tinyurl.com/byobclosed Closed bugs] = Roundtable = == Kev == == Neil == == Tomcat == == Les ==') |
(→Kev) |
||
| (3 intermediate revisions by 2 users not shown) | |||
| Line 9: | Line 9: | ||
== Kev == | == Kev == | ||
* Re-starting weekly meetings | |||
* Overview of work David Rolnitzky will be doing. | |||
** David will be focusing on product messaging, comms planning, and working on addressing targeting different user groups that BYOB will benefit. | |||
* Requirement gathering; what do people need | |||
** Nothing additional is required currently, beyond a bug update for the config wizard redesign. Kev to schedule a meeting with Neil to further discuss UI work and direction, and to ensure everyone has sufficient access to staging. | |||
* How best to separate milestones out for this quarter and follow-on quarters | |||
** Need to be able to visualize what's required currently, and what the priorities are for any open bugs tasks. As we plan additional project features, there's a need to integrate those into a unified view. Kev to put together an overview page outlining work by quarter by priority, and add it to the project page. | |||
* Long-term planning. | |||
** Per the bugs on the [[Partnering:Projects:BYOB|project page]], there's a need to start long-term planning for things like buildbot integration (with RelEng), new features (different products), Enterprise Support, and longer term features/functionality. Suggested a meet-up in Toronto for a day or two in March to discuss f2f; kev to send email to set up in second or third week of March. | |||
== Neil == | == Neil == | ||
| Line 15: | Line 25: | ||
== Les == | == Les == | ||
* Getting back up to speed on BYOB | |||
* Estimating time for bugs | |||
* Grabbed some P1's and P2's for a first ~20 hr chunk of work | |||
* Got some kinks out of [https://dm-partdist-stage01.mozilla.org/ BYOB staging] and set up auto-update from SVN trunk | |||
Latest revision as of 20:37, 17 February 2010
Open Items
Roundtable
Kev
- Re-starting weekly meetings
- Overview of work David Rolnitzky will be doing.
- David will be focusing on product messaging, comms planning, and working on addressing targeting different user groups that BYOB will benefit.
- Requirement gathering; what do people need
- Nothing additional is required currently, beyond a bug update for the config wizard redesign. Kev to schedule a meeting with Neil to further discuss UI work and direction, and to ensure everyone has sufficient access to staging.
- How best to separate milestones out for this quarter and follow-on quarters
- Need to be able to visualize what's required currently, and what the priorities are for any open bugs tasks. As we plan additional project features, there's a need to integrate those into a unified view. Kev to put together an overview page outlining work by quarter by priority, and add it to the project page.
- Long-term planning.
- Per the bugs on the project page, there's a need to start long-term planning for things like buildbot integration (with RelEng), new features (different products), Enterprise Support, and longer term features/functionality. Suggested a meet-up in Toronto for a day or two in March to discuss f2f; kev to send email to set up in second or third week of March.
Neil
Tomcat
Les
- Getting back up to speed on BYOB
- Estimating time for bugs
- Grabbed some P1's and P2's for a first ~20 hr chunk of work
- Got some kinks out of BYOB staging and set up auto-update from SVN trunk