Partnering:Projects:BYOB:Meetings:2010-02-17: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
(Created page with '__TOC__ = Open Items = * [http://tinyurl.com/byobopen1 Open bugs] * [http://tinyurl.com/byobclosed Closed bugs] = Roundtable = == Kev == == Neil == == Tomcat == == Les ==')
 
 
(3 intermediate revisions by 2 users not shown)
Line 9: Line 9:


== Kev ==
== Kev ==
* Re-starting weekly meetings
* Overview of work David Rolnitzky will be doing.
** David will be focusing on product messaging, comms planning, and working on addressing targeting different user groups that BYOB will benefit.
* Requirement gathering; what do people need
** Nothing additional is required currently, beyond a bug update for the config wizard redesign. Kev to schedule a meeting with Neil to further discuss UI work and direction, and to ensure everyone has sufficient access to staging.
* How best to separate milestones out for this quarter and follow-on quarters
** Need to be able to visualize what's required currently, and what the priorities are for any open bugs tasks. As we plan additional project features, there's a need to integrate those into a unified view. Kev to put together an overview page outlining work by quarter by priority, and add it to the project page.
* Long-term planning.
** Per the bugs on the [[Partnering:Projects:BYOB|project page]], there's a need to start long-term planning for things like buildbot integration (with RelEng), new features (different products), Enterprise Support, and longer term features/functionality. Suggested a meet-up in Toronto for a day or two in March to discuss f2f; kev to send email to set up in second or third week of March.


== Neil ==
== Neil ==
Line 15: Line 25:


== Les ==
== Les ==
* Getting back up to speed on BYOB
* Estimating time for bugs
* Grabbed some P1's and P2's for a first ~20 hr chunk of work
* Got some kinks out of [https://dm-partdist-stage01.mozilla.org/ BYOB staging] and set up auto-update from SVN trunk

Latest revision as of 20:37, 17 February 2010

Open Items

Roundtable

Kev

  • Re-starting weekly meetings
  • Overview of work David Rolnitzky will be doing.
    • David will be focusing on product messaging, comms planning, and working on addressing targeting different user groups that BYOB will benefit.
  • Requirement gathering; what do people need
    • Nothing additional is required currently, beyond a bug update for the config wizard redesign. Kev to schedule a meeting with Neil to further discuss UI work and direction, and to ensure everyone has sufficient access to staging.
  • How best to separate milestones out for this quarter and follow-on quarters
    • Need to be able to visualize what's required currently, and what the priorities are for any open bugs tasks. As we plan additional project features, there's a need to integrate those into a unified view. Kev to put together an overview page outlining work by quarter by priority, and add it to the project page.
  • Long-term planning.
    • Per the bugs on the project page, there's a need to start long-term planning for things like buildbot integration (with RelEng), new features (different products), Enterprise Support, and longer term features/functionality. Suggested a meet-up in Toronto for a day or two in March to discuss f2f; kev to send email to set up in second or third week of March.

Neil

Tomcat

Les

  • Getting back up to speed on BYOB
  • Estimating time for bugs
  • Grabbed some P1's and P2's for a first ~20 hr chunk of work
  • Got some kinks out of BYOB staging and set up auto-update from SVN trunk