QA/QA Community/Meetings/2011-09-07: Difference between revisions

 
(5 intermediate revisions by the same user not shown)
Line 7: Line 7:
*September 7, 2011  
*September 7, 2011  


*Attendees:  
*Attendees: matt, marcia, james, ashughes, vlad, bebe
 
= [[QA/Test_Days#Upcoming_Schedule|Upcoming Testdays]] =
= [[QA/Test_Days#Upcoming_Schedule|Upcoming Testdays]] =
* Supposed to be a WebQA testday this Friday -- need to check with Marlena (ashughes)
* Supposed to be a WebQA testday this Friday -- need to check with Marlena (ashughes)
Line 53: Line 54:


Action Items:
Action Items:
*Get communications out as soon as possible for upcoming Test Day
*Get communications out as soon as possible for upcoming Test Day(entire team)
TestDay (entire team)
* Make timezone a dropdown instead of free form text field in TestDay questionnaire [ashughes]
* Make timezone a dropdown instead of free form text field in TestDay questionnaire [ashughes]
* marcia to contact Mary about status of Firefox 4 tshirts.
* marcia to contact Mary about status of Firefox 4 tshirts.
Line 60: Line 60:
* matt to clarify if the next mtg will be during QA work week
* matt to clarify if the next mtg will be during QA work week
* waverly to organize a Test Day event for the 16th and 23rd.
* waverly to organize a Test Day event for the 16th and 23rd.
* ashughes needs team feedback on https://docs.google.com/spreadsheet/ccc?key=0AmkRt0ylPb8zdEFaWGtlbjdNNXowR210S2NVb0sxVnc&hl=en_US
* marcia needs to get a vidyo URL to post


*Whiteboard Status thread
Whiteboard Status thread
 
*Identify how we are going to proceed
1. Identify how we are going to proceed
*Dedicated time within the work week to get things assigned.
2. Dedicated time within the work week to get things assigned.
*Goal of the work week that we have done a lot of triage - clearly Firefox 8-9-10  
3. Goal of the work week that we have done a lot of triage - clearly Firefox 8-9-10  


*Move forward with plans to get Devs involved in QA test events
Move forward with plans to get Devs involved in QA test events
**Push forward invite to a Webcast -  
*Push forward invite to a Webcast -  
**Get Something planned for dev.planning - request help from devs that are interested
*Get Something planned for dev.planning - request help from devs that are interested
**Target Friday of the QA work week - possibly the 23rd
*Target Friday of the QA work week - possibly the 23rd
**Doesn't have to be a developer that hosts the test event. Could be someone like Asa or Mitchell
*Doesn't have to be a developer that hosts the test event. Could be someone like Asa or Mitchell


*Meetups in Klug
Meetups in Klug
*Matt suggested that the Waverly team set one up and then go from there.
*Matt suggested that the Waverly team set one up and then go from there.


*Next meeting
*Next meeting
**Unclear whether the next Community meeting will fall during the QA Work week
*Unclear whether the next Community meeting will fall during the QA Work week


===Action items/Notes from (20110824) meeting===
===Action items/Notes from (20110824) meeting===
canmove, Confirmed users
7,108

edits